Fire Station 3 Base Bid and Fire Station 3 and Fire Station 1 Alternate Work
fbaf461ba70f80d52fcf93fc9eaf2e4b3d3605af372f212cc856c50e8597166dIndexed text · page 5
Show all pages7, Alternate No. 6 Scope of Work — Fire House No. 3 — Install Clothes Dryer Cabinet The work includes the removal of the existing gas fired clothes dryer and gas line as shown on the plan and installation of the new electric clothes dryer © Remove the existing gas fired clothes dryer « Install (1) new electric clothes dryer as specified « Install new electric dryer vent in existing gas dryer vent opening — patch opening « Install new electrical wiring and circuit breaker as required for the new dryer Project Notes: All work performed on Fire House #3 shall be performed on the exterior or within the existing building envelope. No changes to the building footprint or height are proposed, Construction sequencing will be coordinated to maintain firehouse operations during the renovation period. All work performed on Fire House #1 shall be performed on the exterior building wall or within the existing building envelope. No changes to the building footprint or height are proposed. Construction sequencing will be coordinated to maintain firehouse operations during the renovation period. HERBST-MUSCIANO, LLC Architecture & Planning New Jersey Certificate af Authorization AC 830 811 Main Street, Second Floor, Boonton, New Jersey 07005 Tel 973 538 3815 Fax 973 538 4095 yauw.herbstmuscizno.com
File revisions (1)
- Oct 30, 2026
fbaf461ba70f171,675 bytes