Fire Station 1 Sheet A 02
1339b7dfb37f8de30e837ccae208ace369ce4b69e8b247edc0e9a14e2a64d569Indexed text · page 1
Show all pagesMECHANICAL 10 ©O TOMET ROO Orz@® DonuiToRY cn (oO) FAN meenTiON ‘SviTcH new gpure & "ae i OSE DRYER 1018 DIRECTOR 102 FIRE PREVENTION 106 ® GENERAL OFFICE 105 FLOOR PLAN @A uskT oc iSt alTeRNATE #3 B. ALTERNATE BID WORK- Fire House No.1 ‘The Alternate Bid Work is Work at Fire House No. 3 and Fire House No. 1. Seven (7) Scopes of Work define the Altemate Bid Work. The seven (7) Scopes of work include: 1, Alternate No. 1 Scope of Work — Fire House No. 1 - Replace Oil Separator Work The work includes the removal and replacement of a malfunctioned Oil Separator Dispose of contaminated water found by approved NIDEP Methods Snake out existing plumbing lines Supply and install a new Oil Separator 2, Alternate No. 2 Scope of Work— Fire House No. 1 - Split System Work ‘The work includes the upgrading of the existing installed HVAC Split System. Installing Additional Split System Interior Cassettes and Roof Top Equipment Installing new refrigerant lines to support the new equipment Remove and capture existing refrigerant gases and install new refrigerant gases Der /NIDEP methods Installing new refrigerant line set covers Installing new Electrical Work including a new electrical panel and wiring to support the new HVAC system requirements 3. Alternate No. 3 Scope of Work — Fire House No. 1 — Exterior Lighting and Plumbing for Shower The work includes the upgrading of the existing exterior lighting system: Installing new LED light fixtures on existing circuits to increase foot candle levels in the Parking, access lane, front entrance and gatage door areas. + Lighting shall be initiated by use of new Dusk / Dawn Sensors + Electrician to verify existing circuits to existing fixture and panel and panel breaker locations ‘The work includes the upgrading of the existing shower area: Installing a new collapsible dam at the shower sill Relocating existing faucet shower controls 5, Alternate No. 4B Scope of Work — Fire House No. 1 — Garage Exhaust Fans ‘The work includes the installation of a new roof top Make-Up-Air (MUA) unit end exhaust fan system Install (4) new roof mounted inlet hoods Install new ducting from intake units to floor area inside the garage Tnstall (1) new roof mounted exhaust fan Install new wiring and electrical as required for the new mechanical work 6, Alternate No. 5 Scope of Work — Fire House No, 1 ~ Remove
area inside the garage Tnstall (1) new roof mounted exhaust fan Install new wiring and electrical as required for the new mechanical work 6, Alternate No. 5 Scope of Work — Fire House No, 1 ~ Remove Existing Rubber Floor and Replace with VCT The work includes the removal of the existing rubber floor tile and base and the installation of new Vinyl Composition Tile (VCT) floor and floor base Review existing asbestos tile (VAT) locations located under the existing rubber floor, Provide a sample area of rubber floor tile removal over the existing VAT. Detesmine if VAT remains intact during the rubber floor tile removal. Contractor shall provide an Alternate price for rubber floor tile removal by a New Jersey licensed asbestos abatement contactor. Remove existing rubber floor tiles and base Install new VCT floor tiles and base (NOTE: Floor tile color is selected by West Orange) Ss ae =) HERBST MUSCIANO LLC on 1 | en [rocco suewssons TOWNSHIP OF WEST ORANGE DEPARTMENT OF PUBLIC WORKS. FIRE STATION 1 EXTERIOR & INTERIOR IMPROVEMENTS & RENOVATIONS 415 VALLEY ROAD WEST ORANGE, NJ 07052 rs CONSTRUCTION FLOOR PLAN, LEGEND, AND NOTES GM AS NOTED HEA 2028 cM 8156-FS1
File revisions (1)
- Oct 30, 2026
1339b7dfb37f801,016 bytes