Show all pagesOctober 27, 2026 2 | P a g e Structural Design & Inspection Foundation Settlement Retaining Wall Design Remodeling & Construction Consultation Septics Residential site Plans Stormwater Management / Drainage Zoning / Variances Environmental Permitting Realty Inspection Review 5.6 Roof overhangs should be dimensioned to ensure it does not project more than 2 feet as per ordinance 25-8.2(c). Otherwise, a variance shall be required for any feature that projects more than two feet into a required yard; Partially Addressed. The Applicant has revised Planning/Zoning Board Application seeking for this variance. The Applicant shall provide testimony Testimony to be provided. 5.7 Testimony should be provided by Applicant’s professional to clarify that the location of the roof leaders on the ground will not adversely affect adjoining property owners; Not Addressed. The Applicant has provided the locations for the proposed roof leaders; however, testimony should be provided clarifying that the adjoining property owners will not be adversely affected. Testimony to be provided. It should be noted that the garage size increase (150 sf) is situated in currently impervious cover (driveway), therefore there is no net gain in runoff. 5.8 Testimony should be provided by Applicant’s professional to confirm that the garage improvements are is within the 0 to 10% slope range that allows 100% disturbance. Refer to section 25-28 of the Township’s ordinance; Partially Addressed. The Applicant has provided a Soil Movement Calculation and Soil Erosion and Sediment Control Plan document and has provided measurements and calculations indicating that slopes within the Limit of Disturbance do not exceed 10% (~7.55%). The plans have not been revised to reflect these calculations, additionally the Applicant should provide testimony that the proposed improvements are in accordance with the slope and disturbance thresholds in Section 25-28 of the Township’s ordinance. Topographic survey was conducted, and resultant contour lines added to plan. Project location is within slope area less than 10% grade. 5.9 A soil erosion and sediment control plan with details needs to be provided and show the area of disturbance; Partially Addressed. The Applicant has provided a Soil Movement Calculation and Soil Erosion and Sediment Control Plan document and has provided a narrative outlining
and show the area of disturbance; Partially Addressed. The Applicant has provided a Soil Movement Calculation and Soil Erosion and Sediment Control Plan document and has provided a narrative outlining the calculation of the Limit of Disturbance (913 SF), protection measures, sequence of construction and permanent stabilization. The plans should be revised to include the standard notes from Hudson-Essex-Passaic Soil Conservation District (HEPSCD) including details for silt fence, inlet protection and tracking pad requirements. The plans should be further revised to callout the square footage of the Limit of Disturbance. Limit of disturbance is shown and found to be approximately 200 sf, and therefore significantly below the threshold of triggering a SE&SC plan/permit. With the exception of the de minimis area for footing excavation, no soil is disturbed. As such, only the applicable HEPSCD notes were added to plan.
File revisions (1)
- Nov 5, 2026
65663755dee788,331 bytes