Supporting Documentation · Nov 19, 2026
10 27 26 Memo Ltr to Z Carballo R Vollmar
65663755dee7473dc08a1e86aee148c5a319abe64cedfd776c3d42714371ff13Indexed text · page 3
Show all pagesOctober 27, 2026 3 | P a g e Structural Design & Inspection Foundation Settlement Retaining Wall Design Remodeling & Construction Consultation Septics Residential site Plans Stormwater Management / Drainage Zoning / Variances Environmental Permitting Realty Inspection Review 5.10 Provide soil movement calculations for the proposed improvements within the limit of disturbance. A soil removal permit will be required if more than 300 CY of soil will need to be moved; Partially Addressed. The provided Soil Movement Calculation should be added to the plans. Also, a soil removal permit from the Board will be required since the total soil volume is over 750 CY and exceeds 300 CY. Soil movement calculation was determined to be 9 CY and added to plan. I trust you find these responses acceptable. As mentioned above, appropriate testimony will be provided at the ZBA hearing. Sincerely, Richard “Rick” Vollmar, PE, PP, CME Owner / President Blue Line Stone Home & Engineering Cc.: Max Grossman, Applicant
File revisions (1)
- Nov 5, 2026
65663755dee788,331 bytes