Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 2, 2026

PB 26 06 Fire House 1 and Fire House 3 Draft Resolution

Preserved file SHA-256378fe23ddd97e03a0f512d226bb75c8e83977568d47de9e66c829552f71d371c

Indexed text · page 2

Show all pages
Page 2

Fire Station #1 Demolition and Construction Floor Plan, Legends, and Notes (Sheet A-01) Gary Musciano, RA, PP of Herbst-Musciano, LLC 12-22-2025 Fire Station #1 Electrical Plan and Lighting Specification (Sheet AE- 01) Gary Musciano, RA, PP of Herbst-Musciano, LLC 12-22-2026 Fire Station No. 3 Construction Floor Plans and Scope of Work Notes (Sheet A-01) Gary Musciano, RA, PP of Herbst-Musciano, LLC 2026 2. Samantha Giblin, Esq. of the law firm Semeraro & Fahrney, LLC represented the Township of West Orange (“Township”). 3. The Township proposes a coordinated program of interior and exterior renovations, building-system upgrades, accessibility improvements, and window and door replacements intended to address existing conditions, extend the useful life of both facilities, and improve their safety, reliability, energy efficiency, and functionality for emergency personnel. 4. The proposed work constitutes capital improvements to existing municipal public safety facilities. 5. All proposed work will occur on the exterior of the existing buildings or within their current footprints- no expansion of either building footprint, increase in building height, or change in the existing fire station use is proposed. 6. Construction will be phased and coordinated to maintain emergency response, vehicle access, public safety, and continued firehouse operations during the renovation period. 7. The proposed improvements are divided between Fire Station No. 1 and Fire Sation No. 3 and are categorized as either base-bid work or alternate work.

File revisions (1)