Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 2, 2026

PB 26 06 Fire House 1 and Fire House 3 Draft Resolution

Preserved file SHA-256378fe23ddd97e03a0f512d226bb75c8e83977568d47de9e66c829552f71d371c

Indexed text · page 3

Show all pages
Page 3

8. The base bid consists of the Township’s highest priority improvements and applies only to Fire Station No. 3. 9. Alternate improvements are proposed for both stations and will be selected after final costs are determined, subject to available funding. 10. As to Fire Station No. 3, the base bid includes repairs to the damaged brick façade, repointing, and resealing of masonry, cleaning and water resistant treatment of exterior walls, repair of exterior cracks, and construction an ADA-compliant entrance landing and ramp with exterior site lighting proposed at nine locations. 11. Interior work at Station No. 3 includes new flooring and wall base, repair or replacement of interior doors and installation of code-compliant hardware, ADA shower units, low-flow plumbing fixtures, a split air conditioning system, fire alarm upgrades, and cleaning, repair and painting of interior walls. 12. The Base Bid for Station No. 3 also includes replacement windows with double-pane, low emissivity glass and insulated frames, replacement of exterior personnel doors, frames and hardware, cleaning, repair and repainting of lintels and sills, and removal of existing window or wall-mounted mechanical units and their supports. 13. There are two alternate improvement concepts proposed for Fire Station No. 3- the first would improve garage ventilation through new roof-mounted make up air unit, associated horizontal and vertical ductwork and dampers, a new roof exhaust fan, structural supports, an extended gas line and roof supports, related masonry cutting and patching, roof screening, and relocation of furnishings as necessary for installation.

File revisions (1)