PB 26 06 Fire House 1 and Fire House 3 Draft Resolution

Preserved file SHA-256378fe23ddd97e03a0f512d226bb75c8e83977568d47de9e66c829552f71d371c

Indexed text · page 4

Show all pages
Page 4

14. The second alternate improvement concept for Fire Station No. 3 would replace the existing gas-fired clothes dryer with an new electric dryer, adapt and patch the existing vent opening, and provide the required electrical wiring and circuit breaker. 15. The proposed work at Fire Station No. 1 is organized in five (5) alternatives. The first would remove and replace oil separator, clear the existing plumbing lines, dispose of contaminated water in accordance with approved New Jersey Department of Environmental Protection methods, and install a new separator. The second would upgrade the existing HVAC split system by adding interior cassettes and rooftop equipment, new refrigerant lines and covers, compliant recovery and replacement of refrigerant, and the electrical panel and wiring needed to support the upgraded system. The third option would install LED exterior lighting at approximately twenty locations serving the parking area, access lane, front entrance, and garage door areas, with dusk-to-dawn controls, and would modify the shower by installing a collapsible dam at the shower sill and relocating the existing controls. The fourth alternative would improve garage ventilation through a new rooftop make-up air unit, four roof- mounted inlet hoods, ductwork to the garage floor area, a roof-mounted exhaust fam, and associated electrical work. The fifth option would address the existing flooring by evaluating the condition of vinyl asbestos tile beneath the rubber flooring by evaluating the condition of vinyl asbestos tile beneath the rubber flooring, using a licensed asbestos-abatement contractor if required, removing the existing rubber tile and base, and installing new black vinyl composition tile and base. 16. The Township structured the project with Fire Station No. 3 improvements in the base bid and additional work at both stations as alternates so that the highest priority work

File revisions (1)