1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Public Questions 55 that will be in coordination with the forester. Again, if this application were improved (sic) we -- the applicant will have to work with the forester regarding the placement of those off-site trees and the landscaping plan in general. MR. SLY: Okay. With the changing in grade of the exit, I think it was some points over eight -- eight percent, and now the addition of a sidewalk which, I don’t know, brings us back six to eight feet or more, does that affect the slope of the exit drive or any sight lines necessary, particularly presuming no stoplight? MR. MORONSKI: Based on prior testimony, no, because we’re proposing -- it’s an eight and a half percent slope on Eagle Rock, 10 and a half exists at -- at Laurel and -- and to remain. And as I had noted that the project design proposes to work to minimize the disturbance of trees to the extent feasible. MR. SLY: Okay. Since a large portion of this proposed disturbance, tree removal and the heavy construction I presume will be needed at the edge of Eagle Rock right along the roadway, is there any testimony as to the projected period of time that traffic will be disrupted and potentially, our guests, et cetera?1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Public Questions 56 MR. MORONSKI: I -- I don’t -- I don’t have any information on that. I don’t know. MR. SLY: Do you know if there will be any need for closure of traffic, detours, redirecting impact potentially on our guests arriving on time to their appointed events, et cetera? MR. MORONSKI: I don’t know. MR. SLY: Do you know if there are any plans in place to protect from the runoff of the soil and erosion that will result during this period of construction? MR. MORONSKI: The plans include a soil erosion and sediment control plan, which has to be approved by -- as part of the overall site plan. These erosion measures will be implemented and the -- the county Soil Conservation District will also review the plan. MR. SLY: Thank you. It appears I’m out of time. CHAIRMAN BAGOFF: Thank you, Mr. Sly. MR. MORONSKI: Thank you. CHAIRMAN BAGOFF: Do any other members of the public have any questions for Mr. Moronski on his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Joe P., please state

Page 16

NSKI: Thank you. CHAIRMAN BAGOFF: Do any other members of the public have any questions for Mr. Moronski on his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Joe P., please state your1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Public Questions 57 name and address for the record. MR. PANNULLO: Joseph Pannullo, Holton Lane, Essex Fells. Good evening. CHAIRMAN BAGOFF: Go right ahead, Sir. MR. PANNULLO: Thank you. Mr. Moronski, are you familiar with Vision Zero Safe Streets in New Jersey and West Orange? MR. MORONSKI: I -- I did -- I did reference that in my testimony, the 2023 West Orange action plan, Vision Zero; yes. MR. PANNULLO: Okay. And have you considered that as it applies to this application? MR. MORONSKI: We did. Although it’s not directly a master plan document, it’s obviously of interest to the township and to the community, and one of the factors involved there is pedestrian safety. And any time you have an opportunity to have sidewalks, as we talked about, and it’s hard to build sidewalks on an existing street network. And when you get an opportunity to, as -- as this app -- as this application is doing, I think it does contribute in the long run toward pedestrian safety goals, so it would be part of Vision Zero. MR. PANNULLO: So would you recommend as a planner that this -- that the -- that what is1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Public Questions 58 considered here, subject to an approval, take into account Safe Streets, Vision Zero on all four sides of this intersection? MR. MORONSKI: I can on -- the application is limited to -- to this site and we were -- we could -- these are the portions of the site that are under our control and management. MR. PANNULLO: Does the site as designed now with respect to at least the driveway that will be across Oval Road have sidewalks or a pedestrian path from Eagle Rock Avenue up to the Crestmont? MR. MORONSKI: No, it does not. MR. PANNULLO: Okay. So those -- that roadway, if you will, would simply be made to accommodate vehicles. Is that correct? MR. MORONSKI: You’re talking about the driveway? MR. PANNULLO: Yes, Sir. MR. MORONSKI: Yes. MR. PANNULLO: Okay. So, have you seen the -- there -- there are a number of reports, documents entered on the -- the agenda. I don’t believe you were here the night that Mr.

Page 16

s, Sir. MR. MORONSKI: Yes. MR. PANNULLO: Okay. So, have you seen the -- there -- there are a number of reports, documents entered on the -- the agenda. I don’t believe you were here the night that Mr. Pehnke -- I got to ask him some questions. I didn’t get to finish. I think that was July 1st. But some of the things he testified to were