Supporting Documentation · Dec 2, 2026
Crestmont_West_Orange_2026 06 03_CONDENSED_4up_with_Keyword_Index
0c791e65cb51f4c3f0a1c4b988c8817340beaea25e3e2fc6a25daec644b4e373Indexed text · page 10
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy / Pehnke - Direct 31 MS. McGOVERN: Mr. Pehnke, please raise your right hand. K A R L P E H N K E, APPLICANT’S WITNESS, SWORN MS. McGOVERN: Thank you. MR. SCHKOLNICK: Okay. Chairman, I know Mr. Pehnke has been recognized but I am going -- in this proceeding, obviously want to have a -- quite a complete record here, so I’m going to ask him to place his credentials into the record. THE WITNESS: Certainly. So for the record, again, my name is Karl Pehnke, associate principal with Langan Engineering and Environmental Services. My offices are located at 100 University Square Boulevard in Princeton, New Jersey. I am a registered professional engineer in the state of New Jersey. My license is in good standing. I’ve been prac -- my area of expertise is traffic engineering, which I’ve been practicing for some 40-something years now. I have appeared before West Orange in the past and qualified as such. CHAIRMAN BAGOFF: Do any of the -- MR. SCHKOLNICK: Chairman, I’d sub -- CHAIRMAN BAGOFF: I’m sorry. Go right ahead, Mr. Schkolnick. MR. SCHKOLNICK: I’m sorry. I’d submit Mr.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 32 Pehnke as an expert in the field of traffic engineering. CHAIRMAN BAGOFF: Thank you. Do any members of the board have any questions about Mr. Pehnke’s ex - - expertise? Seeing none, we accept Mr. Pehnke as an expert in traffic engineering. Go right ahead, Sir. MR. SCHKOLNICK: Thank you. DIRECT EXAMINATION BY MR. SCHKOLNICK: Q Karl, you’ve obviously analyzed this project in terms of its traffic and traffic safety features. Is that accurate? A That is correct. Q And can you provide the board with an overview of the -- of the civil- and traffic-related issues and the challenges and -- and the benefits to Crestmont and the community? A I can. And let me pull up my screen-sharing. I’m going to make sure -- let’s see. Q And Karl, you’re going to be using only documents that were in our application documents and that are available online, nothing new? A That’s correct. Q And I’m going to ask, when you refer to a document, you call out the sheet and the last revision date just to make sure we all have it tied together.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 33 We have not submitted revised plans at this
d the last revision date just to make sure we all have it tied together.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 33 We have not submitted revised plans at this time, Chairman, so there’s only one set. CHAIRMAN BAGOFF: Okay. BY MR. SCHKOLNICK: Q Okay? This was marked as A-1. This is the aerial. You’re going to use that, Karl? A Correct. Q Okay. A-1, this was marked earlier tonight. A That’s correct. So by way of a little bit of -- of background and as inferred by Ms. Cancellaro just a few minutes ago, planning for this project has certainly spanned a long time. I became involved about two and a half years ago and was retained by West Essex Highland, LLC to progress the design of improvements along Eagle Rock Avenue as well as the traffic signal installation at Oval Road. Prior to that, my -- the predecessor traffic engineer who has since retired, Mr. Walter Lublanecki, had been substantially involved with the West Essex Highland project, the county, the municipality, as -- on prior applications and through the development of the settlement agreement and, ultimately, development of the concept of improvements along Eagle Rock Avenue and Oval Road, which I’ve taken over and have been progressing the design of.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 34 That design effort has also incorporated, because of impacts on -- associated with widenings, the coordination with the Crescent -- Crestmont Country Club, which my partner, John Cote, who’ll be re- testifying a little further, coordinated on the site design features that married to the roadway improvement. So there’s been a design coordination effort between the -- what I would call the public improvement that is being designed under -- under my signature versus the integration and the related site improvements that occur as a result of the -- the widenings and improvements at -- at Oval Road. So one of the -- the initial efforts in -- in the design process and it certainly, as I said, has spanned many years, but I’ve familiarized myself as it -- as I got involved with this project is understanding basically the existing conditions and warranting conditions for an improvement and the need, the analysis of those factors related to the existing operations and the safety of the -- the study area ultimately with a goal to develop a --
d warranting conditions for an improvement and the need, the analysis of those factors related to the existing operations and the safety of the -- the study area ultimately with a goal to develop a -- an improvement that improves the overall safety and operation of the - - the project area and really represents the best solution for improving overall safety and operations, and -- and that’s really what we do from an engineering
File revisions (1)
- Nov 20, 2026
0c791e65cb51194,909 bytes