Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 43 standard to bring it in relatively flat before we climb up to an eight percent slope. The existing driveway basically -- oh. I should introduce this. So this is the -- a sheet out of -- it’s actually sheet 14 of 22 out of the preliminary roadway -- Eagle Rock Avenue roadway improvement plans I prepared under my signature dated February 12th of 2026. So basically, the existing driveway runs down and connects with Eagle Rock Avenue basically between the Pleasantdale Chateau driveway and wake -- Wakeman Street. It’s a continuous grade down and then meets just on the inside of the -- the radius and just to the west of land that was previously donated, I believe, to West Orange Township. So that grade doesn’t really meet the county standards. The proposed grade that we would have on the new roadway has been designed to meet the county standards and then come up into the site, so part of the impacts on the site that Mr. Cote will discuss is how they -- how they integrated the need to bring the road up at a proper grade and then deal with the -- the parking lots and -- and meet the parking lots. That was -- that was a challenge that he worked closely with the country club on and I was on the periphery on that. So he could probably talk to you more about that.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 44 So going to sheet 14 of -- of 22, basically this is the -- the signing and striping plan from the project and it really looks -- it’s really focused on the Oval Road and Eagle Rock Avenue new drive -- and the new driveway from Crestmont Country Club. So as I indicated, we are widening Eagle Rock Avenue. So that widening all occurs on the south side of Eagle Rock Avenue. There is no change in the curb line adjacent to the Essex Fells Country Club. There are no changes to the curb lines on Oval Road. All of the widening occurs to the south, to -- to this applicant, the Crestmont Country Club. So we basically add roughly 12 -- 12 feet -- 12 to 13 feet of pavement. And then behind the pavement, we also now grade the border with what’s called a border area, which is the area eight to ten feet behind the curb, we grade that flat. So it’s a walkable surface through there. That’s generally done to make sure that you have proper sight lines for people
area, which is the area eight to ten feet behind the curb, we grade that flat. So it’s a walkable surface through there. That’s generally done to make sure that you have proper sight lines for people traveling along the roadway. It’s a properly maintained border area. And that’s -- that’s the standards that we follow from the Department of Transportation and Essex County. So it’s a really substantive improvement and widening project that will enhance the operational1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 45 characteristics of this section of Eagle Rock Avenue and make it safer to drive along it. So the other aspect of the safety is separating the left turns onto Oval Road from the through traffic so that any vehicle that is slowing to enter and -- and turn onto Oval Road is stored out of the through traffic and does not disrupt that through traffic flow, does not cause vehicles to have to -- to go around a stopped vehicle, and basically just creates a safety enhancement for both through vehicles that are traveling along Eagle Rock Avenue as well as those that are regularly turning onto -- to Oval Road. The Crestmont Country Club driveway will come down. It’ll have a two-lane approach, left turn lanes, and then basically a right turn lane which will allow through movement. So if there’s any guests that live up in the -- the Highlands, they’ll be able to continue across onto Oval Road. The intersection also will be fully modernized. It’ll use the current forms of detection, will be fully compliant with the -- the current regulations in the MUTCD and will include pedestrian accommodation. So all four legs of the intersection will have crosswalks, handicap ramps, and connecting sidewalks so that somebody that wants to cross Eagle Rock Avenue in this1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 46 area has a safe way to do that with pedestrian heads and pedestrian push-buttons and guidance to sidewalks and handicap ramps. So all of what the -- all of the modern conveniences and -- and bells and whistles that come with a current traffic signal are being installed at this location, as we would do in any new design. The improvements going over to sheet 2013, as I said, include continuous widening along Eagle Rock Avenue. What that does is it gives us the opportunity to extend the left
would do in any new design. The improvements going over to sheet 2013, as I said, include continuous widening along Eagle Rock Avenue. What that does is it gives us the opportunity to extend the left turn lane, which currently ends where my -- my hand is right now and adding about 200 feet of additional storage in cue. And again, that’s - - provides for safety improvement along the westbound side of Eagle Rock Avenue, storing additional vehicles that want to make the left to Laurel Avenue outside of the three lanes. So overall, the section of Eagle Rock Avenue between Laurel Avenue and, going back to the other sheet, Oval Road will be significantly enhanced, all providing a public benefit. This really is a capital improvement that just is benefitting the existing through traffic along Eagle Rock Avenue and Oval Road and -- and addressing the conditions that exist out there today. So these plans will be progressed through Essex
File revisions (1)
- Nov 20, 2026
0c791e65cb51194,909 bytes