Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy / Opening Statement 3 *** CHAIRMAN BAGOFF: Welcome back, ladies and gentlemen. We now have PB-26-03, Crestmont Country Club, 750 Eagle Rock -- SECRETARY VITE: Hold on. I don’t see (indiscernible). UNIDENTIFIED FEMALE: I’m here. SECRETARY VITE: Oh. Sorry. I thought you - - your camera was off. Okay. Sorry. CHAIRMAN BAGOFF: Okay. That’s okay. 750 Eagle Rock Avenue, Block 174, Lot 1.01, zone R-2. The applicant is proposing the installation of a traffic signal at the intersection of Eagle Rock Avenue and Oval Road. Modifications to the existing driveway and parking area are also being proposed. For the applicant, Mr. Schkolnick. MR. SCHKOLNICK: Thank you, Chairman. Richard Schkolnick on behalf of the Applicant, representing Crestmont Country Club tonight. As you mentioned, we’re here for preliminary and final site plan approval with some C variances. For the record, we are at 750 Eagle Rock and it’s identified as Block 174, Lot 1.01 on the tax maps. You’re all aware, that’s the golf course and clubhouse with related facilities.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Opening Statement 4 We are in the R-2 zone, where the use is permitted. We’re not proposing any new buildings; I think the Board is aware. The crux of this application is additional parking at the facility and then a new traffic signal and new exit for the country club. The traffic signal will align Eagle Rock with Oval Road into a much safer 4-way intersection. There’s also a widening of Eagle Rock Avenue, drainage improvements. This is going to bring safety improvements to Crestmont and the community. We’re going to have extensive testimony on all these improvements, the site layout and gra -- grading. We have additional stormwater management which we think it’s going to be helpful. We have extensive landscaping design, tree removal, tree planting. In conjunction with the traffic improvements, the country club has had change in the types and usage of the facility by its members. Over the last few years, it’s become more of a year-round facility. Its parking needs have increased and this application proposes 32 new parking spaces to address some of those operational issues. There are topographic challenges involved in creating the retaining walls. We have to deal with the slopes to install the
on proposes 32 new parking spaces to address some of those operational issues. There are topographic challenges involved in creating the retaining walls. We have to deal with the slopes to install the traffic light and create the new1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Opening Statement 5 intersection. These topographic challenges create some variances dealing with wall heights and disturbance of steep slope, so well be discussing that as we go along. We do think there are considerable safety improvements for the entire community that are going to come with the light in the intersection and we hope you’ll come to understand that these safety improvements outweigh the harms from what we believe are modest deviations from the ordinance standards. Chairman, as we opened, as you mentioned, as I mentioned, I represent Crestmont Country Club. I represent their interests, but we’re not blind. I don’t have my head in the sand. We recognize that the West Essex Highland application had a 4 to 4 vote and we’re going to discuss that as we go along. This is a complex -- a challenging case with legal elements to it. I’m going to discuss that with Dana Cancellaro tonight, she’s the general manager of the country club. I have no doubt that you and the board members and the community are going to have questions and concerns on this, because there is an interrelationship between the 2020 settlement agreement between West Essex Highlands and the Township. It’s relevant. We’re going to do our best to address those issues and why we think this application makes sense.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Opening Statement 6 For right now, I’m going to say we have a -- we have to deal -- Crestmont has to deal with a 2020 settlement agreement with the Township that remains in place, and that agreement obligates West Essex Highlands to install this new traffic signal at Oval Road and Eagle Rock and critically, critically, it requires the Township to use eminent domain authority to acquire property to build that signal. Let me say that again. The Township committed to using eminent domain to acquire property, which would be from my client, Crestmont, to build that new signal. So Crestmont Country Club was faced with being on the back end of that awesome power of eminent domain. That’s the town’s ability to take its
ld be from my client, Crestmont, to build that new signal. So Crestmont Country Club was faced with being on the back end of that awesome power of eminent domain. That’s the town’s ability to take its property without its consent, forcibly. Crestmont Country Club reacted reasonably, we believe, reasonably, and worked with West Essex Highlands and the Township and the County over multiple years to solve a public -- public safety problem. The solution addresses Crestmont’s parking needs as well and it includes this new intersection. It includes eliminating Crestmont’s existing very steep and potentially dangerous existing exit road. I would submit, Chairman, at the end, you’ll have sufficient evidence that what we’re presenting to
File revisions (1)
- Nov 20, 2026
0c791e65cb51194,909 bytes