Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 2, 2026

Crestmont_September_2_2026_Condensed_with_Keyword_Index

Preserved file SHA-25657c034a28d1c8a980a9438693f4fe6cb0ac77cfc3fa04a551290b5558b588db8

Indexed text · page 12

Show all pages
Page 12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 39 MR. COTE: So, I’ll go back to -- and again, just to apologize. Anything related to the traffic- related safety elements that it provides was covered by my coworker traffic engineer that provided his testimony. What I will say relative to safety measures that my engineering component of the project provides is we’re improving the drainage that is existing along Eagle Rock Avenue in the proposed condition. So from that point of view, we’re providing that component of the design that’s a -- one of the added improvements overall. So, relative to traffic, that would be, again, already having been testified through the traffic engineer. MS. BENNETT: Okay. Thank you. So then I’m going to shift to my stormwater and site engineering question. How much additonal impervious surface is being created by the driveway, parking, and roadway improvements? MR. COTE: Sure. So the on-site increased impervious is around 12,000 square feet, a little over a quarter acre. And then the off-site relative to Eagle Rock Avenue is around 9900 square feet. So all told, it’s slightly over a half an acre, just about a half an acre, worth of impervious that’s being proposed1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 40 under this project. MS. BENNETT: Okay. And then would you let us know the existing and proposed runoff rates for the two, ten, 25, and 100-year storm events? MR. COTE: Sure. So the existing, there’s two areas of analysis. There was the east and west I referred to in my earlier response to one of the folks asking questions and on the east end over by Eagle Rock Ave and Laurel Avenue, the proposed discharge, there’s two different sets of storm events. We design for the current storm events and plus for a future storm event considered to be the year 2100s. So, the proposed -- the existing two-year for the area adjacent to Eagle Rock Ave and Laurel Ave is a 13.48 CFS peak flow for the two-year, and the proposed is 11.32. The 10-year is 23.47 CSF, existing, and the proposed 19.76 CFS. The 100-year 44.56 CFS and the proposed is 38.87 CFS. And that’s for the current storm events. Now I’ll speak to the future storm events. The future storm events are, for the two-year, existing, 16.83 and for proposed, 14.07 CFS. For the 10-year, existing, 29.21

Page 12

’s for the current storm events. Now I’ll speak to the future storm events. The future storm events are, for the two-year, existing, 16.83 and for proposed, 14.07 CFS. For the 10-year, existing, 29.21 CFS and proposed, 24.77 CFS. For the 100-year, 58.39 CFS versus 53.61 in the proposed condition. And that’s for what we refer to as1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 41 our point of analysis one at the intersection of Laurel and Eagle Rock Avenue and at the other end of the site, what is considered to be point of analysis two, the discharge for the current storm events for the two-year is 9.63 CFS. The proposed is 5.67 CFS. For the 10- year, it’s 17.05 CFS. For the proposed, it’s 10.31 CFS. For the existing 100-year, it’s 3.74 CFS and for the proposed, it’s 23.96 CFS. And again, that’s the current storm events that we calculated. And then going into the future storm events, the two-year is existing for -- is 11.97 CFS. The proposed is 7.27 CFS. The 10-year is 21.2 CF -- .02 CFS, the proposed is 14.02 CFS. The 100-year is 42.47 CFS, existing, and the proposed is 31.63 CFS. And that’s the future storm compared to the -- the current storms for both watersheds. MS. BENNETT: Thank you. I think you've already answered this, but I'm going to ask the question. If it's already been answered, just say that, please. Where exactly the stormwater from the modified site discharge is? I think you did answer that. MR. COTE: Yeah, the connections are both in Eagle Rock Avenue proper, with pipes running to the east and to the west of Oval that are at the tail ends1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 42 of the limit of the overall project work. MS. BENNETT: Does any -- MR. COTE: Tying into the existing county's stormwater structure, drainage system. MS. BENNETT: Thank you. Does any additional volume, velocity, or concentration of runoff ultimately reach neighboring residential properties? MR. COTE: The difference, if you're asking this -- so you may want to restate that question. Your question is with respect to what does the stormwater design accomplish in its goals? Is that what you're asking? Maybe you can restate that question, I don't know. MS. BENNETT: Well, so it is what I'm asking, but those additional volumes, velocity, or concentration of runoff, would they

Page 12

that what you're asking? Maybe you can restate that question, I don't know. MS. BENNETT: Well, so it is what I'm asking, but those additional volumes, velocity, or concentration of runoff, would they ultimately reach neighboring residential properties? MR. COTE: So the nature… the way you design stormwater today is you actually design for rate, not for volume. So, with respect to the overall, the increased impervious, we'll have an increase in volume, but the rate has slowed down so that you actually are, by DEP standards and by the township standards, you're creating a reduction in flow rate from the discharge of the improvements. And in this respect, it's in

File revisions (1)