Supporting Documentation · Dec 2, 2026
Crestmont_September_2_2026_Condensed_with_Keyword_Index
57c034a28d1c8a980a9438693f4fe6cb0ac77cfc3fa04a551290b5558b588db8Indexed text · page 15
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 51 MR. WEISLEDER: Right. On how large of a portion of Eagle Rock is that? MR. COTE: From -- from -- we're doing it from Laurel Avenue on the west end, where it intersects with Eagle Rock Avenue, to the east end of this property, to where we have control of our work. MR. WEISLEDER: Okay. So you've explained that the retaining wall and storm water systems are needed because of the parking lot grading. If Crestmont wasn't adding these additional parking spaces, would you still need the same wall, grading, and stormwater work to take place? MR. COTE: I would still -- I would still need stormwater for both. The walls are associated with creating adequate grades for the parking lot, and like I spoke to earlier in my testimony. But the actual detention systems would also be required because of the widening of Eagle Rock Avenue to provide the additional lanes that are proposed and widening for the center left turn lane. MR. WEISLEDER: Right, but the stormwater work, I'm specifically talking about the parking lot, not the -- not Eagle Rock. I think we can look -- MR. COTE: The parking lot is a component -- MR. WEISLEDER: -- separately. Correct?1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 52 MR. COTE: I am -- I answered your question stating that the roadway improvements for Eagle Rock alone would require stormwater management, the basins that you were asking about, and that we've combined the improvements for the parking lots with the stormwater associated with the widening of Eagle Rock to make it one system. So they're both necessary for the purpose of the overall development. MR. WEISLEDER: But one could be done without the other, right? MR. COTE: Anything can be done independent of each other, but that's not relevant to this application. MR. WEISLEDER: Okay. Just asking. Is the widening and regarding of Eagle Rock mainly being done because of the new exit and traffic signal, or would that work have to be done anyway? MR. COTE: The work was requested, relative to putting in a signal associated with the settlement agreement. And if I understand correctly, that ultimately, from my traffic engineer's discussions, that the county is in favor of this project. MR. WEISLEDER: Okay. And did you happen to look at any other ways to lay out
understand correctly, that ultimately, from my traffic engineer's discussions, that the county is in favor of this project. MR. WEISLEDER: Okay. And did you happen to look at any other ways to lay out the parking so you could add other spaces without as much grading, or1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 53 having a huge retaining wall or tree removal or -- MR. COTE: There was -- MR. WEISLEDER: -- doing extra work along Eagle Rock? MR. COTE: This is the one we came up with to minimize the impacts. So the answer is yes, and this is the one we came up with to minimize. MR. WEISLEDER: But there could be alternative ways to do it without doing all of this, correct? MR. COTE: You could -- you could design it 100 different ways, but again, you know, our efforts were to minimize the impacts. So that's the plan that we came up with, and that's before the board tonight. MR. WEISLEDER: Okay. So you said the existing driveway is difficult because of the angle and visibility. What is preventing you from moving or redesigning the parking lot and driveway in a different way that would address these problems without all these other site changes that are needed and that you're asking for? MR. COTE: Again, we're asking for this relative to minimize the amount of impacts. I could design it and have a much greater impact on the overall area. I could do -- I could increase impervious, have1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 54 more issues with tree removal. Again, you're asking a question as to, could I design it in a number of different ways? The answer is yes, but this is the way that was the most conducive for minimizing impacts to the existing trees, minimizing impacts to steep slopes. So all those conditions that I'm asking for the variance, are supported by this application and the nature of the design. MR. WEISLEDER: Okay. So if you're adding more water into the stormwater for the county, does the country club become responsible, or the construction become responsible to assist the county in that stormwater increase? MR. COTE: The county's actually getting the benefit of the overall design by improving their existing structures, to my testimony earlier about the fact that this is actually taking substandard pipes and networks in the roadway and improving them. So
t of the overall design by improving their existing structures, to my testimony earlier about the fact that this is actually taking substandard pipes and networks in the roadway and improving them. So the county's getting the benefit of this improvement already as a function of the project. MR. WEISLEDER: And in any way, does this affect West Orange stormwater containment or control? MR. COTE: This is consistent with regulations in terms of the requirements of the design for the reductions in the post-development flow rates,
File revisions (1)
- Nov 20, 2026
57c034a28d1c411,398 bytes