Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 55 and in that effect, we are improving the conditions in the downstream receiving components of this design. And that was the -- that's already been, you know, reviewed by the engineer, as well as, it has to be consistent with the town's and the county's requirements. MR. WEISLEDER: Okay. Thank you. MR. COTE: Thank you. CHAIRMAN BAGOFF: Thank you. Does any member of the public have any questions for Mr. Cote on his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Justin Goldsman, please state your name and address for the record. MR. GOLDSMAN: Justin Goldsman, Moran Road. CHAIRMAN BAGOFF: Go right ahead, Sir. MR. GOLDSMAN: Thank you. Thank you, planning board members and Mr. Cote. Can you tell me in your professional experience or estimation how much capacity to absorb, or prevent runoff does a standard bio-retention basin have? MR. COTE: The bio-retention is a component of water quality for the basin. It's not a retention with respect to -- it does slow down the water in some respects and serves that purpose, but its goal is for water quality, not for water quantity. Water quantity1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 56 is controlled by the outfall structure proper of the basin. MR. GOLDSMAN: Okay. So it does have a runoff component, though, as you're -- as you're saying? MR. COTE: Yeah. It filters the water before it comes into a control structure that then runs off the water on a controlled rate. Justin Goldsman: Sure. So how much in terms of a capacity quantity would that -- would a bio- retention basin have for runoff purposes? MR. COTE: It’s -- it’s -- every design is different. This design is intended to address the water quantity, the rate reductions I talked about earlier was the 50 percent of the two-year reduction of the two-year storm, 75 percent reduction down to 75 percent of the 10-year storm, and reduction down to 80 percent of the 100-year storm. So that's the -- that is the capacity component of these basins in terms of what they're able to address to reduce that stormwater runoff downstream. MR. GOLDSMAN: I appreciate that. So that's not necessarily a, you know, a numerical value, and I understand the comp -- I understand the -- MR. COTE:
dress to reduce that stormwater runoff downstream. MR. GOLDSMAN: I appreciate that. So that's not necessarily a, you know, a numerical value, and I understand the comp -- I understand the -- MR. COTE: Yeah.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 57 MR. GOLDSMAN: I get it. So, my -- I guess my question would be, in comparison to these bio- retention basins, in terms of their capacity to reduce stormwater runoff, are you able to provide a rough estimate of how many trees that would be the equivalent of? MR. COTE: No, I have no way to equate that. But I did already state, prior to this set of questions to the earlier, comment about what the actual reductions are in those flow rates, both -- based on both the current storm design as well as that future year 2100 storm that we're required to design to. MR. GOLDSMAN: Correct, I heard that. I did hear that, and I appreciate that, but I'm trying to get at a different question here, because you've also said throughout your testimony that your impacts are -- whether they're positive or negative, you're concerned with the scope of the work as it relates to the boundaries of your project. You know, some people have asked questions about how far down does it go, and you've said it stops at the scope of your work. So my question is, if you have a bio- retention basin that you're putting in with regard to limiting the impact that your project is creating, those bio-retention basins limit the impact up to the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 58 point of your property whereas a tree, or 313 trees, as you're proposing to remove according to your EIS study, has a higher capacity to handle water as it flows down -- downstream for the rest of the residents on Eagle Rock Avenue. MR. COTE: I can’t -- I can’t opine on a tree-by-tree basis. I mean, sorry, so ask your question, I apologize. MR. GOLDSMAN: So, my -- MR. COTE: Ask your question. MR. GOLDSMAN: I appreciate that. No, so the point of my question is, is does one or two bio- retention basins, as you're proposed, equate to the capacity of 313 trees that you're proposing to remove? CHAIRMAN BAGOFF: I’m sorry, Mr. Goldsman. He didn’t testify to anything about tree capacity equaling the bio-retention basis, so we’re going to have to move on. MR. GOLDSMAN: Okay. MR. COTE: I
remove? CHAIRMAN BAGOFF: I’m sorry, Mr. Goldsman. He didn’t testify to anything about tree capacity equaling the bio-retention basis, so we’re going to have to move on. MR. GOLDSMAN: Okay. MR. COTE: I don’t have an answer for that question relative to the way you’re asking it. MR. GOLDSMAN: Okay. Can -- can you maybe perhaps -- MR. COTE: I can -- I can just state clearly that the town’s ordinance has a tree replacement
File revisions (1)
- Nov 20, 2026
57c034a28d1c411,398 bytes