1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 67 running the length of the improvement. So there’s -- just -- just think of it as it’s a simple -- take a grass strip that would be there in the future and putting a sidewalk in. That’s -- MR. PANNULLO: Okay. MR. COTE: -- the easiest way to probably describe it. MR. PANNULLO: Okay. So -- so that said -- by the way, the last -- I don't know if you know, but the last meeting, it was testified to that there would be some portion of, I think it's Eagle Rock, that would be conveyed to the county in this -- before it’s all done. Are you aware of that? MR. COTE: Yes, that's represented on our plans. MR. PANNULLO: Right. So what portion of Eagle Rock, if that's where it is, would go to the county, how much, and what is it for? MR. COTE: It's a strip of land approximately 9,000 square feet -- 9,446 square feet in size, running the length, and it varies in width for the, depending on where it is in the geometry. But overall, 9,446 square feet. MR. PANNULLO: Is that frontage? MR. COTE: Frontage. Correct.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 68 MR. PANNULLO: Okay. And will that also accommodate things like power for the signal, things like that? Is that where that comes -- MR. COTE: Yeah. Everything -- everything under the easements within the signalized intersection are part of that overall process. MR. PANNULLO: Understood. Is there any blasting required to make any of this happen? MR. COTE: I'm not aware at the moment whether blasting is required. The work would be given by the -- what do you call that? The -- I apologize, I didn't say it the right way. The work will be governed by the nature of the retaining walls proposed, so blasting right now would probably be Hydrohammer, if you ask me, but I'm not -- I don't want to speak out of turn. MR. PANNULLO: So has there been a geo- technical study yet to any of this, or no? MR. COTE: We did a soils investigation for the purpose of the stormwater, and part of the conditions of the approval will be that the -- all these walls have to go through their building -- the township building department for technical review. So that'll be done as part of that. MR. PANNULLO: Okay. I --1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 69 CHAIRMAN

Page 19

lding department for technical review. So that'll be done as part of that. MR. PANNULLO: Okay. I --1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 69 CHAIRMAN BAGOFF: Thank you, Mr. Pannullo. That’s the end of your time. I appreciate that. MR. PANNULLO: I’ll be back, Sir. Thank you. CHAIRMAN BAGOFF: Okay. Again, does any -- anybody have their hand raised who has not had a chance to speak tonight, please identify yourself. Only people who have not had a chance to speak tonight. ZOOM OPERATOR: Lori, please state your name and address for the record. MS. HASSELL: Hello. Yes. So it’s Lori Hassell and I live at 62 Lapis Circle in West Orange, New Jersey. So, I have a two-part question, and I'm sure this was -- I'm going to assume that there was lots of discussion to realign the driveway on Eagle Rock from the Crestmont property down Eagle Rock to the end of the Crestmont property line, or realign the driveway further down Laurel and remove the one-way driveway or not, as it is today. My question is if there was, and I'm assuming there was, were there any negative reasons or oppositional reasons not to focus on these alternatives, aside from this great idea that putting a light in there would be a benefit? MR. COTE: They were previously addressed in the traffic testimony. That -- those questions were1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 70 specifically answered by Mr. Pehnke. MS. HASSELL: So I'm not referring to traffic, reasons, I'm talking about from a civil stan… from your standpoint. MR. COTE: Yeah, there's no -- it’s -- it’s part of it is, I would say the majority of it's driven by traffic relative to the positioning of the intersection and the signalized intersection. The operations of the facility and the way they operate for the one-way coming in and the one-way going out relative to their operations, that's an operational condition. So there's no -- there'd be no benefit, you know, from my design, from a civil design, to alter that. I -- you know, I look at the grading, the drainage, those components of it, but operational questions and traffic questions are via the operation component and the traffic engineer side of it. So nothing on the civil side would be relative to what you're questioning. MS. HASSELL: So, but again, I'm not asking with respect to traffic,

Page 19

operation component and the traffic engineer side of it. So nothing on the civil side would be relative to what you're questioning. MS. HASSELL: So, but again, I'm not asking with respect to traffic, that's a whole ‘nother thing. MR. COTE: No, I undersand, but I'm answering relative -- that -- the answer is no relative to civil. To answer your question specifically from my point of