Supporting Documentation · Dec 2, 2026
Crestmont_September_2_2026_Condensed_with_Keyword_Index
57c034a28d1c8a980a9438693f4fe6cb0ac77cfc3fa04a551290b5558b588db8Indexed text · page 21
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 75 associated with whatever other requests the board makes of us here, such as the sidewalk that was discussed earlier. MR. TRACTENBERG: Okay. I have no other questions. Thank you. CHAIRMAN BAGOFF: Thank you -- MR. COTE: Thank you. CHAIRMAN BAGOFF: -- Mr. Tractenberg. Last person for Mr. -- questions for Mr. Cote. ZOOM OPERATOR: Joe P., please state your name and address for the record. MR. PANNULLO: Thank you. Joseph Pannullo, Holton Lane, Essex Fells. Mr. Cote, just a few more questions. Are there any sidewalks provided along the driveway into the Crestmont itself, or are they simply roads? MR. COTE: They're just simply roads. Correct. MR. PANNULLO: So, I spoke with I think Dana Cancellari (sic) three years ago, spoke with her again a little while -- a few months -- I don't know, a month and a half ago. The notion that a bus stop, and Mr. Pehnke testified that there was a provision, potentially, for the ability to handle a bus stop. Are you aware of that, or is that part of anything in the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 76 plans that you've -- MR. COTE: That's part of Mr. Pehnke's testimony. It's not relevant to my testimony, unfortunately. MR. PANNULLO: Okay. So, but the -- so -- well, yes, maybe, maybe not. If there was a bus stop provided there, not by your hand, and there were people that work at the Crestmont Country Club, which would benefit the club in its own way, because there's a bus stop there, how would they actually traverse Eagle Rock to the club if there's no sidewalk on the driveway, or no steps? And what grade would that be? MR. COTE: Yeah. I -- the reason we don't have one along the driveway, it's an exiting maneuver only for the facility, so operations are -- again, it's an operational question. I'm not sure how they would address that. MR. PANNULLO: Okay. So -- but it's not -- it's not in the plan now, as submitted. Is that fair? MR. COTE: Yeah. It's not part of our current design. Correct. MR. PANNULLO: Okay. Is there any containment of water in the current -- the elevation now, which is the parking lot, at the top? Water flows down. Is any part of the plan designed, besides catchment, or1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 77 detention
parking lot, at the top? Water flows down. Is any part of the plan designed, besides catchment, or1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 77 detention or flow down, anything going to be captured up on top before it gets down? MR. COTE: The only element to that is really a water quality -- excuse me, component, my apologies. The porous pavement element on the upper parking lot provides a water quality measure. That's the -- one of the current standard allowable designs for the treatment of the runoff from the parking lot. That's how we achieve part of our overall water quality goals. So it's a -- MR. PANNULLO: Understood. MR. COTE: It's a water quality measure on top. MR. PANNULLO: So is that to say that there was water contained up on top, or no? MR. COTE: It’s -- it’s filtered through the porous pavement. I don’t want to say contained because that refers to -- we have detention systems down below. This is just a pass-through water quality element. MR. PANNULLO: Fair. Okay. So -- so with regard to the water that is filtered, where it’s contained, where it flows, where it goes -- MR. COTE: Yeah. If you want to -- MR. PANNULLO: Eventually -- yeah. Go ahead. I’m sorry.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 78 MR. COTE: No. I’m sorry. If you’re -- if you’re asking about, for example, in the detention system down below, those are, you know, bio-retention basins. If you’re asking about the parking lot up top, you know, there’s a temporary storage for the water to be allowed to filter through and then make their way out of that in particular. So there’s -- you know, if you want to call it detention, you can. I just don’t want to -- I want to answer your question so you understand the functionality of it. So if that -- if that answers your question, then maybe that answers the future question. MR. PANNULLO: I -- I appreciate that. With regard to the elevation, if there’s going to be no degree change even though the road is widened and there’s retaining walls built and there’s a sidewalk extending that, time of concentration or velocity, you know, is no different? Is that -- MR. COTE: It's calculated -- they're calculated by the same means between existing and then proposed, and the conditions that we have, and within our stormwater report, in order to achieve
Is that -- MR. COTE: It's calculated -- they're calculated by the same means between existing and then proposed, and the conditions that we have, and within our stormwater report, in order to achieve compliance with the township's stormwater management, we had to use those factors in our design. And how they traverse
File revisions (1)
- Nov 20, 2026
57c034a28d1c411,398 bytes