Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 2, 2026

Crestmont_September_2_2026_Condensed_with_Keyword_Index

Preserved file SHA-25657c034a28d1c8a980a9438693f4fe6cb0ac77cfc3fa04a551290b5558b588db8

Indexed text · page 26

Show all pages
Page 26

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Direct 95 recommended by this board, from Laurel Avenue to the end of the property line, not on any other property, but the idea to enhance the potential for pedestrian activity. The site improvements do not increase the intensity of the use, they improve the parking situation. We're not proposing any buildings here. We're not proposing to increase the intensity of the site. The tree replacement plan that contributes to the aesthetic improvements, and that's noted throughout the plans, and -- and the documents. There are no NJ DEP permits required, for the project. Mr. Cote did note that the 8 percent grade is acceptable in winter conditions. There are other areas that are steeper, such as I noted, near Laurel. A detention system is required for the Eagle Rock Avenue improvements. The applicant has agreed to the condition to maintain the sidewalk on Eagle Rock Avenue. The sidewalk was already accounted for in the retaining wall design. And in terms of the area -- in terms of the impervious coverage, it was noted in testimony, about 12,000 square feet on site, a quarter of an acre, another quarter of an acre off-site. The project area itself, this was noted, was just1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Direct 96 a little under four acres, 3.95 acres, and we're talking about this on an overall 146-acre site. So we're focusing on a very small area which has some very practical improvements which make substantial -- substantial beneficial impacts, as I've noted. There's no substantial impairment to the intent and purpose of the zone plan or the zoning ordinance. We're a permitted use in the R-2 zone. We're increasing the number of parking spaces. Yes, we're not near 700, we're not going to get there, but we are moving in a direction where we can combine with minimizing the disturbance. The sidewalk provides connectivity. Your 2019 Master Plan update, it talks about a couple of purposes that are relevant here. Master Plan Purpose 8, which is on page 8 of the update, providing a safe, efficient transportation and circulation routes, which, this is an objective that remains valid. They talk about transportation modes beyond motor vehicles. The township has taken actions to promote pedestrian and bicyclist safety. While it may not be at this specific

Page 26

bjective that remains valid. They talk about transportation modes beyond motor vehicles. The township has taken actions to promote pedestrian and bicyclist safety. While it may not be at this specific location, the overall township theme, the idea is to provide options in terms of circulation safety. Also in your 2019 Master Plan update, Master Plan1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Direct 97 Purpose 15, Coordinating Public and Private Procedures and Activities, that's on page 10 of the 2019 update. And that goes hand-in-hand with the Municipal Land Use Law Purpose M about coordination of various public and private procedures. It was noted about the site plan waiver, that this board can grant exceptions as may be reasonable and within the general purpose and intent of the site plan ordinance. And this is with regards to the removal of the trees, proposing to remove 191 trees on slopes greater than 10 percent. This is simil -- the rationale is similar to the steep slope disturbances and the retaining wall variances. It's driven by the topographic condition. The tree replacement plan is in accord with the proposed tree restoration plan. Those drawings are in the site plans. The overall number of trees is 313 that would be removed, but in terms of replacement trees, it's well over 500 trees, most of which are going to be on site. There was testimony to that. There's gonna be coordination, with the -- with the forester, again, working hand-in-hand with the -- with the township's professionals to meet the intent of the tree replacement ordinance. So, in terms of the -- the variances, I do believe1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Direct 98 they can be granted under the various C criteria, whether the C-2 or, in the cases of the steep slope and the retaining walls, the C-1(b) criteria and that the site plan waiver is driven by the conditions with regards to the steep -- the steep slopes and the topography, the idea being that it's to minimize the disturbance while providing the proposed improvements. And that sums up my testimony. Thank you. Q Okay. A couple questions for you, Sean. You certainly touched on it, on the negative impacts to surrounding properties, because we heard from a lot of people tonight, some living in Essex Fells, and some living pretty far away, but in terms

Page 26

You certainly touched on it, on the negative impacts to surrounding properties, because we heard from a lot of people tonight, some living in Essex Fells, and some living pretty far away, but in terms of your planning testimony, do you see any negatives to any of those immediate neighbors in the surrounding area? A I don't, and I think that was as supported by the testimony presented by our prior professionals in terms of the drainage improvements, in terms of the circulation improvements. And yes, the terms to the on-site improvements, because it is a benefit to enhance the Crestmont Country Club, which is a fixture in the community, long, long established, also. So you have both public and private benefits. The plan minimizes concerns with regards to disturbance of trees, addressing drainage and

File revisions (1)