Supporting Documentation · Dec 2, 2026
Crestmont_September_2_2026_Condensed_with_Keyword_Index
57c034a28d1c8a980a9438693f4fe6cb0ac77cfc3fa04a551290b5558b588db8Indexed text · page 28
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 103 Q Okay. My next question has to do with pedestrian walkways, pedestrian movement, and everything else. From what you see as being presented, and any, you know, adjustments, any lighting, any sidewalks, you know, crosswalks, have you seen that everything has been looked at to make it a very walkable, very safe, walkable area for people using Crestmont Country Club and their facilities? A I think it's certainly -- you know, I know that there was previous testimony about how where would the connections, where would it connect to the sidewalks, but like many sidewalk projects, you -- you have an opportunity to start somewhere, or to build somewhere. And the design of this sidewalk in terms of the lighting that's proposed, you know, it's a good foundation to have at this location, you know, not just for Crestmont, but also to build on in the surrounding -- to the surrounding area as well. Where it goes in the future, well, that depends -- that -- I don’t know, but any time you can help to build a pedestrian network, and -- and I know that West Orange in particular has been engaged in Vision Zero project. That’s not directly a planning project, but it does have elements of planning to it because of circulation -- pedestrian circulation concerns. I1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 104 certainly think this touches on addressing some of those concerns. Q Okay. Do -- and this may not be your, you know, maybe a traffic engineer's thing, but within the complex or anything else, are there going to be any speed-calming, you know, issues put in, like speed bumps, you know, things like that? Do you know of those being installed or required? A Speed bumps on -- on the property, or -- Q Yes. A I -- I don't know. The only thing I heard tonight was Mr. Cote was asked about a question about speed limits, and, you know, coming in the driveway, he mentioned about 15 miles an hour, but I don't know anything about any specific traffic calming on the site. Q Okay. Thank you very much, Sir. Thank you, Mr. Chairman. A Thank you. CHAIRMAN BAGOFF: Thank you. Mayor McCartney, do you have any questions for Mr. Moronski on his testimony? MAYOR McCARTNEY: I do. Thank you, Chairman. BY MAYOR McCARTNEY: Q Mr. Moronski, I do tend to agree with
BAGOFF: Thank you. Mayor McCartney, do you have any questions for Mr. Moronski on his testimony? MAYOR McCARTNEY: I do. Thank you, Chairman. BY MAYOR McCARTNEY: Q Mr. Moronski, I do tend to agree with your1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 105 testimony on the negative community impact but I do have a couple of questions, and they're both really related to the (indiscernible) report. Thank you for addressing all of the issues that were raised in there, but in the (indiscernible) report on page 6 of 10, and maybe Malvika or Greg, you can weigh in on this also, I need a better or clearer understanding about a modular block wall at 21 -- almost 21 and a half feet. That just -- I need a better understanding of that, and is it possible to have that tiered, or that just sounds -- A The -- the issue is, my understanding of it is it is between the -- the drainage basin, the low end of the drainage basin, and the level -- and the level of the -- of the parking -- of the parking area. And what happens is, is that you may have an effect on either the drainage basin, or -- or the parking -- or the parking area itself. It's a -- it's a -- it's a small -- it's a small area of it. We're talking about wall length that's well over 13 -- 1300, linear -- 13 -- over 1300 linear feet. It is -- it is a -- I'll call it a unique situation, just because of the nature of -- of where it is. But again, it kind of strikes -- it strikes a balance between being able to effectively park and1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 106 provide -- provide the spaces at that level, and also not to -- to be able to address the drainage concerns as I understood them in listening to Mr. Cote's testimony. Q Maybe I'm just having a really hard time visualizing that. A I understand. Q The other question is right under that, on that same page, and B, on the steep slopes, I guess my question is really more for our planners and engineers that, do you believe that the testimony satisfied the steep slope varian -- the need for the steep slope variance? Maybe that's not -- MS. APTE: Thank you, Mayor. I actually did have a follow-up question, with -- on that issue from Mr. Moronski, one of the questions that I had is, and especially when it came to the steep slopes testimony, Mr. Moronski kind of stated that these are
a follow-up question, with -- on that issue from Mr. Moronski, one of the questions that I had is, and especially when it came to the steep slopes testimony, Mr. Moronski kind of stated that these are C-1? MR. MORONSKI: B-1(b) (sic). Yes. The -- that they’re based on topography. MS. APTE: Yeah. The -- oh. I'm sorry. Is nobody able to hear me? Is my connection -- MAYOR McCARTNEY: No. We can hear you. MS. APTE: All right. They're based on the topography. So the -- the testimony was they're based
File revisions (1)
- Nov 20, 2026
57c034a28d1c411,398 bytes