Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 107 on topography, so one of my follow-up questions was, was every effort taken in the site plan design in order to minimize the area where this disturbance would be? As in, was this the best option, the way the design was laid out, and this is the least impactful variance when it comes to all the steep slope variances that are needed. Like, they had tried different design, and this was the least amount of variances that was coming because of the topography of the site. So, I think, Mayor, that if we hear from Mr. Moronski, that'll partly answer your question. MAYOR McCARTNEY: Okay. Thank you. Thank you. MR. MORONSKI: Yeah. Yes. Thank -- thank you. Yes, the idea was to minimize the disturbance, the area of disturbance, and in minimizing the area of disturbance is to minimize the disturbance of the trees in particular. As I had noted, if you have more walls, and you spread them out more, you have a greater level of disturbance, which can mean removal of more trees. It's, again, striking a balance, attempting to address the drainage issues, the parking, the level of the parking, the tiers would result in a greater level of disturbance. And… the 21… Foot height is only for about 13 -- feet long. That's 13 feet of over 13001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 108 linear feet of wall area. So we're talking about a little -- about 1 percent of the overall wall length would -- MR. SCHKOLNICK: Goes up that high? MR. MORONSKI: That high, yes. MR. SCHKOLNICK: Okay. Okay. So, that wall's at different levels. The highest is 21 -- MR. MORONSKI: Correct. MR. SCHKOLNICK: But it's -- but the length of the 21 is only 13 feet, you know. MR. MORONSKI: Right. I hope I -- I hope I addressed that question. UNIDENTIFIED SPEAKER: What's the average? MR. CARVER: Oh, good question. I just heard that. What's the average? MR. MORONSKI: The average -- the average -- MAYOR McCARTNEY: That was my next question, thank you. MS. McGOVERN: Sorry. I didn't mean to do that. CHAIRMAN BAGOFF: -- are you done? MR. SCHKOLNICK: We’re -- we're noting that question. MAYOR McCARTNEY: That was my next question, that's okay.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 109 CHAIRMAN BAGOFF: Mayor, are you done? Or Mr. Moronski? MAYOR
OR McCARTNEY: That was my next question, that's okay.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 109 CHAIRMAN BAGOFF: Mayor, are you done? Or Mr. Moronski? MAYOR McCARTNEY: Oh, that -- no. Those were my two questions -- MR. COTE: Would you like me to chime in on that, just not to -- CHAIRMAN BAGOFF: Yes. Go right ahead, Mr. Cote. MAYOR McCARTNEY: Oh. Thank you. Sure. MR. COTE: All right. So just in brief, to -- what Mr. Moronski was just referring to is there's a basin, and the basin tapers down at the bottom, and that's that taper where the 13 feet he was just talking about occurs. That's where the highest section of the wall is. So basically, if you looked at the basin, at the other end of the basin, the wall's only six feet high. At the other end of the basin, as you make your way around the corner, it starts to get smaller and smaller. So it's really just because we have this depressed area at the one end of the wall to size the basin, and to the same comments that was made before in our testimonies, that that would minimize the disturbance. The more you spread that grading out, the more our impacts have to be, and you push further into1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Moronski - Cross 110 the tree line, further back, to take additional trees out. So maybe to add to the question that was asked before about, we did do these designs to minimize those impacts, minimize our disturbances, minimize our variances, and that's -- it was our consideration. We had other alignments we looked at that just made it more -- more impacts, more impervious, to get the same result. MR. SCHKOLNICK: Well, that was Ms. Apte's question about the steps to minimize. MR. COTE: Yes. MR. SCHKOLNICK: -- did a lot of design work in order to -- you have to balance everything, but there was trade-offs between the size of the basin and getting the stormwater is a factor, getting the parking, getting the grading all together. That's where engineering becomes an art -- an art form. Okay. Thank you. MR. COTE: Yup. MR. SCHKOLNICK: Just say, I know if I don't understand it, sometimes my questions can -- move us in the right direction, at least. And then -- so that the 21 feet is only for the width of the 13 feet, where the basin goes down. And then there's other heights. It exceeds the four feet in other areas of -- as
t direction, at least. And then -- so that the 21 feet is only for the width of the 13 feet, where the basin goes down. And then there's other heights. It exceeds the four feet in other areas of -- as well, but
File revisions (1)
- Nov 20, 2026
57c034a28d1c411,398 bytes