blic Questions 57 existing conditions. We’re also taking the opportunity to make the curb lane a 12-foot lane on our side versus an 11-foot lane. It just makes it a safer -- that’s typical engineering standard. With regard to the median, that’s basically still a double yellow line. What you see with the cross-hatching there is just typical shadowing as you transition out the opposing left turn lane. So there is no restriction or change in how movements move into and out of the Pleasantdale Chat -- Chateau. The stop bar is -- is located just over 100 feet from your -- the westerly side of -- of your driveway. That meets and exceeds any standards actually for state highways by the Department of Transportation. Your inbound side really is over 150 feet away, based on the way your driveway is designed, so the signal really has no influence. There is no work proposed along the frontage. The only work in the Pleasantdale Chateau quadrant is some of the traffic signal equipment, the handicap ram ps, and the -- the sidewalk pedestrian connection between the handicap ramps, and that’s mostly an open area in this location, not really any impact on any vegetation. There is no -- although the -- although your frontage is relatively clear today, there is no1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 58 clearing involved, there’s no sight line adjustments along the border areas that need to be made so for the most part, from the handicap ramp across the entire Pleasantdale Chateau frontage back into the property, there are no changes. Everything is really happening to the south side onto the -- the country club property. MR. SLY: Point of information, however, the -- both sides or both of those areas where the drive is to our gatehouse are entrances, it’s an entrance only there. So as I see it, correct me if I’m wrong, that does, again, affect oncoming traffic turning left as the median is drawn in this diagram. MR. PEHNKE: There’s no change. The driveway is still accessible across the -- the painted (sic). There’s no -- there’s no -- that’s a permissible -- permissible movement. And of course, the country -- the -- the Pleasantdale Chateau will have the advantage of the traffic signal for the egress movements from the parking lot. So a lot of positives there for -- MR. SLY: As a -- as a professional, in your opinion, does

Page 16

ntdale Chateau will have the advantage of the traffic signal for the egress movements from the parking lot. So a lot of positives there for -- MR. SLY: As a -- as a professional, in your opinion, does that not add confusion to the average motorists driving across what appears to be a median? MR. PEHNKE: No. Not at all. It’s a typical situation on arterial roads. There’s -- there’s

Page 17

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 59 nothing prohibitive here. MR. SLY: I’ll reserve my comment on that since it’s just testimony. Can you speak to any impingement of that light or potential movement of power lines that exist as present on our property? MR. PEHNKE: There should be no -- should be no impact on the power lines on your property. MR. SLY: Okay. You had also, if I recall correctly, don’t let me put words in your mouth, but had raised concern over an egress on Laurel Avenue partially out of concern for queuing. How do you feel that the light now will affect queuing ability for folks to turn into our property, our gatehouse, if we’re only I’d say approximately 100 feet from that stop sign? It feels like there would be some traffic stacking there for our guests attempting to get in. MR. PEHNKE: It really -- it really depends on time of day. For the most part, we’re seeing excellent operations at this intersection, A levels of service along the -- the main line. So we’re seeing average queues that are, you know, in the area of 50 to 70 feet, well -- well short of your driveway. That doesn’t mean there might be short, short periods of time where there might be an extension to the -- to the driveway. But again, that’s typical near -- near1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 60 intersections. As I said, the location of the driveway meets applicable standards and I really don’t think there’s going to be much of an influence, if anything. Quite frankly, just the opposite, by making a much safe exit for the Pleasantdale Chateau using Oval Road. MR. SLY: At the -- the risk of making a statement, we’ve never in our 30 years had complaints or issues of people exiting out of Oval Road. And most of our guests -- as you’re aware, we’re an event facility primarily. That’s the bulk of our business. That would occur 5:00 p.m. or after when there is high volume of traffic. I think folks have testified to the volume of traffic on Eagle Rock, which is why there’s point of argument for concern of traffic lights here, that within 100 feet there wouldn’t take very many cars to back that up and that could potentially cause inconvenience to our guests but also more difficulty for us accommodating our guests with valet, et cetera, but I’ll -- I’ll reserve your

Page 17

ery many cars to back that up and that could potentially cause inconvenience to our guests but also more difficulty for us accommodating our guests with valet, et cetera, but I’ll -- I’ll reserve your time on -- on elaborating. One further question. Could you help me understand the amount of flow that you currently have exiting your property, use whatever metrics of time and volume that -- that you would like on that, so I can get an understanding of -- of the need for -- for this1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 61 based on the volume of exit of your property. MR. PEHNKE: Well, it varies. Obviously, the country club also has event-type traffic and that occurs bas -- and it has some seasonality to it. On a typical day, you know, the country club membership itself, you see volumes in the morning that are relatively low as the day starts. The afternoon hours, as the afternoon hours progress, we’re basically seeing somewhere on the order of 50 to 60 vehicles per hour that egress the country club. And then event traffic is -- is different. Oval Road itself is experiencing during those same hours variations in volume, anywhere from 90 vehicles per hour to 120 vehicles per hour. And then Eagle Rock Avenue itself is experiencing in excess of 900 vehicles per hour. So they -- they’re all -- those are the general metrics overall, and they vary through the day, as a typical day, morning a little lighter than the evening. Mid-morning drops off, mid-afternoon drops off, then it comes back up. And then certainly, event- type traffic on a Saturday or in the evenings generally occurs when the roadway traffic flows are down. MR. SLY: So are you saying that a range of 50 cars in an hour is what we’re pursuing all of these1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 62 changes for? MR. PEHNKE: It’s -- as I -- my testimony’s been much more extensive than that. We are addressing conditions at the country club that include some parking, internal circulation, and a driveway that they would like to improve the safety of. There is the intersection of Oval Road, that it is desirable to have that improved, and relocating the Crestmont Country Club driveway opposite that location all become part of that package, and -- and that’s what we’ve discussed over the last two meetings. MR.

Page 17

to have that improved, and relocating the Crestmont Country Club driveway opposite that location all become part of that package, and -- and that’s what we’ve discussed over the last two meetings. MR. SLY: Thank you, Mr. Pehnke. One final question, and please don’t take offense to this, but do you feel that advantaging one business in the area should be done at the sake of another? MR. PEHNKE: I don’t think anybody’s getting -- MR. SCHKOLNICK: Object to the question. MR. PEHNKE: -- advantaged with this application. In fact, the Pleasantdale Chateau will get the advantage of the traffic signal that is being built to deal with the overall traffic, so I don’t -- I don’t see that there’s any advantage to anybody. The benefits accrue to everyone at this -- in this particular instance.

Page 18

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 63 MR. SLY: Thank you for your time, Mr. Pehnke. I’ll yield the rest of my time. CHAIRMAN BAGOFF: Thank you, Mr. Sly. Do any other members of the public have any questions for Mr. Pehnke on his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Joe P., please state your name and address for the record. You’re un-muted. MR. PANNULLO: Hello? Hello? I’m sorry. Am I audible? CHAIRMAN BAGOFF: Yes. MS. McGOVERN: Yes. CHAIRMAN BAGOFF: Go right ahead, Sir. MR. PANNULLO: Thank you. I’m sorry. My name is Joseph Pannullo, Holton Lane, Essex Fells. Questions for Mr. Pehnke, please. CHAIRMAN BAGOFF: You have the floor, Sir. MR. PANNULLO: Thank you. Mr. Pehnke, can you tell us who has discretion over the four-way intersection where the traffic signal is proposed? Is that the town of West Orange or Essex County? MR. PEHNKE: Essex County is the jurisdictional agent along Eagle Rock Avenue. The planning board, obviously, with this application, has jurisdiction over the site plan and the -- the layout1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 64 of the -- the egress. But the signal improvements, the intersection improvements, the signal operation all fall within the jurisdiction of the county. MR. PANNULLO: And who has discretion over crosswalks, sidewalks on all four sides of what would be a signalized intersection? MR. PEHNKE: That would be the county. That’s -- it’s -- it’s standard now to a traffic signal to ensure we incorporate pedestrian -- all modes of flow. MR. PANNULLO: Okay. Fair. So in other words, Essex County, Essex County Planning Board ultimately has discretion over what the final form of all four sides of this intersection would look like should it go forward. Yes? MR. PEHNKE: Correct. They will review and provide comment and input to the design plans, which we will incorporate into the final design plans as part of their review and approval process. MR. PANNULLO: So is any of that design for crosswalks or sidewalks on all sides in the current plan or do -- I have not see, unfortunately, in this case documents submitted or design plans. I saw wh at you put up in terms of striping and painting. I’m not sure what it -- what it’s referring to as it’s off

Page 18

-- I have not see, unfortunately, in this case documents submitted or design plans. I saw wh at you put up in terms of striping and painting. I’m not sure what it -- what it’s referring to as it’s off the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 65 screen, but has anything else been submitted? MR. PEHNKE: The -- a preliminary plan set was submitted to this board. A more full plan set was just submitted to the county to start their approval and review process. It basically advant -- advances all the elements of a design that is shown on the exhibit before you. What’s before you is basically what it will look like when it is done, where the crosswalks will be, where the sidewalks will be, where the signal equipment will be. It might tweak a little but for the most part, what’s shown on this exhibit before you is what I would expect will be approved by the county. MR. PANNULLO: I appreciate the time clock on the screen, but is it possible to put the other screen that Mr. Pehnke had displayed earlier? I appreciate it. And -- and with regard to the last comment, so at the beginning of this application tonight, I think Chairman Bagoff asked that sidewalks be added both on -- I think he referred to them as the easterly side? I think maybe it’s the southern side of Eagle Rock on the Crestmont side on both sides of the driveway. Is that correct? MR. PEHNKE: That’s what he requested, yes. MR. PANNULLO: And is that anticipated in the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 66 drawing on the screen? MR. PEHNKE: No. MR. PANNULLO: So would that encroach on the existing Crestmont frontage, if you will? MR. PEHNKE: It would -- it would fall within the area that we’ve already graded and intend to dedicate to the county. That’s already been -- the area -- the border area behind the curb has already been contemplated for dedication to the county and has already been designed to standards. Those standards would accommodate a sidewalk. MR. PANNULLO: Understood. So, in that event, is that going to affect, and maybe you’re the wrong one to answer that, but if those sidewalks get put into place and the relief sought in the application with regard to the -- the steepness of the slope, setbacks of improvements, in all cases, points at least 3, 4, 5, 6, and 7 in the March 17th

Page 18

et put into place and the relief sought in the application with regard to the -- the steepness of the slope, setbacks of improvements, in all cases, points at least 3, 4, 5, 6, and 7 in the March 17th submission by Richard Schkolnick, would those have to be adjusted to accommodate, at minimum, the sidewalks that Chairman Bagoff requested? MR. PEHNKE: No. MR. PANNULLO: Okay. How does Oval traffic -- so traffic on all four sides of this intersection design, crosswalks, et cetera, is at the discretion of

Page 19

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 67 Essex County. I think you said that. Is that correct? MR. PEHNKE: Well, it’s under the jurisdiction of Essex County. MR. PANNULLO: Okay. MR. PEHNKE: It -- it is standard for traffic signals to incorporate pedestrian accommodation. It’s -- it’s part and parcel to traffic signal design today, so it’s really -- I don’t know why you wouldn’t do it. MR. PANNULLO: I don’t disagree. I’m just trying to make sure we know who’s in charge of the final footprint of what’s going to be approved. MR. PEHNKE: At the end of the day, the signal falls within the county’s jurisdiction. MR. PANNULLO: Thank you. So is it fair to say that the traffic coming into -- coming from any direction into ingress/egress from all four sides is material to whatever’s engineered here from a design standpoint, from a level of service, from stacking, et cetera? MR. PEHNKE: Yes. It’s all taken into consideration. MR. PANNULLO: Okay. So with regard to the existing Oval Road directly across from the driveway, at the proposed driveway at the Crestmont, what changes if any would need to occur to Oval Road to accommodate1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 68 this application? MR. PEHNKE: There’s -- there’s no widening on Oval Road. There’ll be regulatory signage and some updated striping. MR. PANNULLO: Okay. MR. PEHNKE: A stop bar associated with the signal rather than a stop sign, stop sign removal, the -- the pedestrian crosswalk striping. But all of that falls within the existing cartway. MR. PANNULLO: So was a traffic study done to determine how much traffic leaving Oval Road during any time, peak time, et cetera, goes east, goes west, and goes south toward 280? MR. PEHNKE: Yes. MR. PANNULLO: Okay. What was the date of that study? MR. PEHNKE: The study that was submitted with this application is dated January of 2026. There was prior studies through the years done of this intersection for various reasons that were also available and considered in review. MR. PANNULLO: So I think in the prior application, at least across the street on the Highlands, the application from Walter Lubanecki was from 2018/19, which we all -- I think we can agree the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 69 county will

Page 19

e application from Walter Lubanecki was from 2018/19, which we all -- I think we can agree the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 69 county will require another study to be done for that side. Would you agree with that? MR. PEHNKE: It’s already been done. It’s a document within that study I just referenced. MR. PANNULLO: So the study you just referenced took into account all four sides, including traffic emanating from Oval Road coming egress out? MR. PEHNKE: That’s correct. MR. PANNULLO: Okay. So how many feet is it from Oval Road, turning right, to get into the Laurel Avenue traffic signal as we stand today? MR. PEHNKE: It’s roughly eight -- eight to nine hundred feet. MR. PANNULLO: And how many cars that leave Oval Road head south? MR. PEHNKE: It depends on the time of -- it depends on the time of day. MR. PANNULLO: Worst case. Mo -- most -- in the peak, worst-case time of day. MR. PEHNKE: Bear with me. I need glasses. MR. PANNULLO: Sure. Thank you. MR. PEHNKE: So, I’m going to reference our most current traffic count. We actually just took the opportunity to get a new traffic count before schools closed back in beginning of June.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 70 MR. PANNULLO: Is that on the record here, Sir? MR. PEHNKE: What’s that? MR. PANNULLO: Is that on record? Do we -- is that on the agenda we could see? Not right now, but is it there? MR. PEHNKE: It’s not in the -- it’s not in the file. As I said, we just took this data. MR. PANNULLO: Understood. MR. PEHNKE: It’s consistent with the data that is in the record and documented in our traffic study. Quite frankly, it’s very -- very similar, but -- MR. SCHKOLNICK: Karl? Karl? MR. PEHNKE: Yeah. MR. SCHKOLNICK: Why don’t you -- for -- for tonight’s purposes, just in case we end of finishing tonight and voting, why don’t you just reference what’s in the January 21st, 2026 report? If we don’t finish, we’ll deal with new counts, but why don’t you just answer on the January 21st, 2026 study? MR. PEHNKE: Give me a minute. So, if we look at the Oval Road approach, your heavier peak periods are generally occurring mornings, 6:00 to 7:00 a.m. where we’re seeing about 89 vehicles making a