1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 63 MR. SLY: Thank you for your time, Mr. Pehnke. I’ll yield the rest of my time. CHAIRMAN BAGOFF: Thank you, Mr. Sly. Do any other members of the public have any questions for Mr. Pehnke on his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Joe P., please state your name and address for the record. You’re un-muted. MR. PANNULLO: Hello? Hello? I’m sorry. Am I audible? CHAIRMAN BAGOFF: Yes. MS. McGOVERN: Yes. CHAIRMAN BAGOFF: Go right ahead, Sir. MR. PANNULLO: Thank you. I’m sorry. My name is Joseph Pannullo, Holton Lane, Essex Fells. Questions for Mr. Pehnke, please. CHAIRMAN BAGOFF: You have the floor, Sir. MR. PANNULLO: Thank you. Mr. Pehnke, can you tell us who has discretion over the four-way intersection where the traffic signal is proposed? Is that the town of West Orange or Essex County? MR. PEHNKE: Essex County is the jurisdictional agent along Eagle Rock Avenue. The planning board, obviously, with this application, has jurisdiction over the site plan and the -- the layout1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 64 of the -- the egress. But the signal improvements, the intersection improvements, the signal operation all fall within the jurisdiction of the county. MR. PANNULLO: And who has discretion over crosswalks, sidewalks on all four sides of what would be a signalized intersection? MR. PEHNKE: That would be the county. That’s -- it’s -- it’s standard now to a traffic signal to ensure we incorporate pedestrian -- all modes of flow. MR. PANNULLO: Okay. Fair. So in other words, Essex County, Essex County Planning Board ultimately has discretion over what the final form of all four sides of this intersection would look like should it go forward. Yes? MR. PEHNKE: Correct. They will review and provide comment and input to the design plans, which we will incorporate into the final design plans as part of their review and approval process. MR. PANNULLO: So is any of that design for crosswalks or sidewalks on all sides in the current plan or do -- I have not see, unfortunately, in this case documents submitted or design plans. I saw wh at you put up in terms of striping and painting. I’m not sure what it -- what it’s referring to as it’s off

Page 18

-- I have not see, unfortunately, in this case documents submitted or design plans. I saw wh at you put up in terms of striping and painting. I’m not sure what it -- what it’s referring to as it’s off the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 65 screen, but has anything else been submitted? MR. PEHNKE: The -- a preliminary plan set was submitted to this board. A more full plan set was just submitted to the county to start their approval and review process. It basically advant -- advances all the elements of a design that is shown on the exhibit before you. What’s before you is basically what it will look like when it is done, where the crosswalks will be, where the sidewalks will be, where the signal equipment will be. It might tweak a little but for the most part, what’s shown on this exhibit before you is what I would expect will be approved by the county. MR. PANNULLO: I appreciate the time clock on the screen, but is it possible to put the other screen that Mr. Pehnke had displayed earlier? I appreciate it. And -- and with regard to the last comment, so at the beginning of this application tonight, I think Chairman Bagoff asked that sidewalks be added both on -- I think he referred to them as the easterly side? I think maybe it’s the southern side of Eagle Rock on the Crestmont side on both sides of the driveway. Is that correct? MR. PEHNKE: That’s what he requested, yes. MR. PANNULLO: And is that anticipated in the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 66 drawing on the screen? MR. PEHNKE: No. MR. PANNULLO: So would that encroach on the existing Crestmont frontage, if you will? MR. PEHNKE: It would -- it would fall within the area that we’ve already graded and intend to dedicate to the county. That’s already been -- the area -- the border area behind the curb has already been contemplated for dedication to the county and has already been designed to standards. Those standards would accommodate a sidewalk. MR. PANNULLO: Understood. So, in that event, is that going to affect, and maybe you’re the wrong one to answer that, but if those sidewalks get put into place and the relief sought in the application with regard to the -- the steepness of the slope, setbacks of improvements, in all cases, points at least 3, 4, 5, 6, and 7 in the March 17th

Page 18

et put into place and the relief sought in the application with regard to the -- the steepness of the slope, setbacks of improvements, in all cases, points at least 3, 4, 5, 6, and 7 in the March 17th submission by Richard Schkolnick, would those have to be adjusted to accommodate, at minimum, the sidewalks that Chairman Bagoff requested? MR. PEHNKE: No. MR. PANNULLO: Okay. How does Oval traffic -- so traffic on all four sides of this intersection design, crosswalks, et cetera, is at the discretion of