Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 2, 2026

Crestmont_July_1_2026_Condensed_with_Keyword_Index

Preserved file SHA-2566b01a07575178f40ccc1c7fd2bb7800eee739e10fe0f22bab1042ebe5cb03c5a

Indexed text

Page 27

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 99 providing an accommodate -- accommodation from a sidewalk standpoint. There’s really no changes or impacts on any of the design features of a traffic signal. MR. PANNULLO: Okay. In -- in the prior application with regard to testimony on Oval Road and the widening or not, you represented to Essex Fells Country Club and were thanked for it by their counsel that in no circumstance would Oval Road need to be widened. Is that -- is that still the case? MR. PEHNKE: That remains true; yes. MR. PANNULLO: So is the applicant willing to stipulate that under no circumstance will Oval Road be widened? Or is that a question for counsel? CHAIRMAN BAGOFF: That’s a question for counsel, not for Mr. Pehnke. MR. PANNULLO: Okay. I’ll leave that stand. How many cars will it take going eastbound on Eagle Rock to turning left into the Pleasantdale Chateau to stack before they can’t make a left turn? MR. PEHNKE: I’m not sure I’m following that question. MR. PANNULLO: Traffic -- there are two ways into -- MR. PEHNKE: There’s two lanes eastbound1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 100 along Eagle Rock Road through the intersection. Are we talking at the Pleasantdale Chateau driveway? MR. PANNULLO: Yes, which -- yeah. Which I think you said was about 100 feet from the signal -- the new intersection. MR. PEHNKE: Yeah. It’s a little better than 100 feet from the stop bar. From the intersection itself, it’s -- it’s probably a little better than that, maybe 120 feet. MR. PANNULLO: So, four or five cars? MR. PEHNKE: Yeah. Gen -- generally, you look at 20 -- 20 to 22 feet per vehicle, so five -- say it’s a -- say it’s a little bit better than five vehicles. Yeah. MR. PANNULLO: Okay. I have one last point and that is that the -- the cost of the light is -- is in evidence before this board in PB-24-01, and that’s attached to this application. So the notion about the cost of the light is -- is on the applicant. It’s in evidence and I just wanted to make sure that was clear, because it was raised. Thank you. CHAIRMAN BAGOFF: Okay. Thank you very much. MR. PANNULLO: I’ll have other questions for you -- I’ll have other for your civil engineer, but we’ll do that later.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public

Page 27

h. MR. PANNULLO: I’ll have other questions for you -- I’ll have other for your civil engineer, but we’ll do that later.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 101 CHAIRMAN BAGOFF: Thank you very much. Do any other members of the public have any questions for Mr. Pehnke on his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Hey. Seth Weisleder, please state your name and address for the record. MR. WEISLEDER: Yes. Seth Weisleder, Howell Drive, West Orange, New Jersey. So, Mr. Pehnke, just to make sure I’m clear, your recommendation seems to be a lot on concerns, which you mentioned that word many times and I’m glad there our private and public entities that are concerned for the public safety and stuff, but the -- your recommendations for a new traffic signal is not based on documented crashes, pedestrian studies, or alternative analysis. Is that correct? MR. PEHNKE: No. It’s not correct. It’s -- it’s -- as I testified at the first meeting, it’s -- it’s based upon engineering study, which includes volume analysis, volume warrants. We meet an eight- hour warrant at that intersection. It’s based upon observations of the existing conditions at the intersection, including sight lines, the acute angles. Those are what have been taken into account. I didn’t delve into accident history because I wasn’t looking to1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 102 warrant the traffic signal based on accident history, and nor do I think we probably would get to the level. That’s a fairly substantial warrant. Quite frankly, I’ve very rarely used that in my career. But the engineering study that’s been done is based upon the methodologies and the Manual of Uniform Traffic Control Devices, which is -- includes looking at the existing conditions, the geometry, the traffic control, the traffic volumes, and all of that is weighed into the determination that this is an appropriate location for -- for improvement and traffic signalization. MR. WEISLEDER: Giv -- given that this is a Crestmont Country Club application for Crestmont Country Club for the parking lot and other things, did you take into account or do a traffic study of the number of cars actually going in and out of Crestmont Country Club alone? MR. PEHNKE: I do have volume data that -- that we have

Page 27

nd other things, did you take into account or do a traffic study of the number of cars actually going in and out of Crestmont Country Club alone? MR. PEHNKE: I do have volume data that -- that we have in our records that we’ll be using for the design of the tra -- final traffic signal timing. As I testified to earlier, that varies throughout the day. It’s relatively low in the morning. It ramps up in the evening. And then certainly, there is event-type traffic that occurs a little more randomly, so to speak.

Page 28

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 103 MR. WEISLEDER: Right, but during those times, isn’t the traffic flow on the -- on the roads around Crestmont lower in the -- in the -- MR. PEHNKE: Yes that would be correct. MR. WEISLEDER: -- early morning -- right. MR. PEHNKE: That’s -- that’s correct. It really wouldn’t be the controlling time period. Generally, the controlling time periods here are the hours that we’ve studied, the -- the morning peak commuter hour and the evening weekday peak commuter hours. Those are typically -- as engineers, what we look at as our controlling design hours. MR. WEISLEDER: Right. So just a question. I’m -- I’m kind of a little confused, then, and this has been brought up that this was all started because of the West Essex Highlands potential development or now hypothetical development. But how would that impact the rest of the design inside the country club, excluding the light? MR. PEHNKE: Be -- because the -- the light isn’t in and of itself the impactful part of it, it is the associated improvements that we consider as engineers when we’re changing the control of an intersection such as the desire to separate left turn traffic from through traffic. That’s the most1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 104 impactful, the design of the left turn lane, which is -- MR. WEISLEDER: But -- but my question is not how it impacts the light, it -- how does it impact the rest of the application? MR. PEHNKE: Right. So what happens is -- MR. WEISLEDER: If nothing’s built, how would that affect having 32 parking lots and redesigning a parking lot. I’m confused. MR. PEHNKE: So -- so the obligation that’s being advanced, as was testified to at the last meeting, is to signalize the intersection, which involves the country club. The country club, as was testified by the manager at the last meeting -- in fact, I’m not going to re-summarize that. I’ll let her testimony stand for the record. But basically, the country club took the opportunity associated with the impacts on their property with the improvements that are being provided at this intersection to marry the improvements they want to do on site and have been planning on site with regard to parking, circulation, and -- and then tying that into the improvement at their driveway. So

Page 28

intersection to marry the improvements they want to do on site and have been planning on site with regard to parking, circulation, and -- and then tying that into the improvement at their driveway. So it’s a -- it’s an application of opportunity to take care of multiple things as a result of the impact of providing the improvement at Oval Road1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 105 and Eagle Rock Avenue. MR. WEISLEDER: Based on concerns. Correct? MR. PEHNKE: Based on concerns. Uh -- MR. SCHKOLNICK: Can you answer that, Karl? MR. PEHNKE: I’m not sure I understand. MR. SCHKOLNICK: Sir, can you try to rephrase? MR. WEISLEDER: Oh. Okay. So anyway -- MR. PEHNKE: Based on everything I’ve testified -- based on everything I’ve testified -- MR. WEISLEDER: We can move on. It’s okay. MR. PEHNKE: -- to over the last two meetings, yes. MR. WEISLEDER: Yes. Okay. Thank you. So I -- I guess I want to just clarify something because I was confused when Mr. Keith Sly asked a question. I think there’s an important distinction, and maybe you can tell us, between a double yellow center line and a painted median, or what do you call that area that you put those diagonal -- MR. PEHNKE: It’s -- it’s a gore area, and there’s no prohibition of crossing the gore area into a private driveway. MR. WEISLEDER: Right. So -- but I thought you’re not allowed to -- so -- but that is to look like1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 106 a median. Correct? According to New Jersey Transit, Department of Transportation. Correct? MR. PEHNKE: No. It’s -- it’s a gore area. It’s a transition area. And -- and there’s no prohibition to crossing it. MR. WEISLEDER: Okay. So if I make my left turn when that is done, apparently then I wouldn’t get a ticket? MR. PEHNKE: That’s correct. MR. WEISLEDER: Okay. I think there’s some distinction that needs to be made between two double yellow lines and then a striped painted median island, that that’s what that looks like. But maybe I’m wrong. MR. SCHKOLNICK: Is that a question, Sir? MR. WEISLEDER: S, it’s not a double -- it’s not a painted -- to look like a painted median. Correct? MR. PEHNKE: Correct. MR. WEISLEDER: Okay. Thank you. That is a question. I’m done. Thank you, Mr. Chairman. CHAIRMAN BAGOFF: Thank you very much. And a little bit more

Page 28

like a painted median. Correct? MR. PEHNKE: Correct. MR. WEISLEDER: Okay. Thank you. That is a question. I’m done. Thank you, Mr. Chairman. CHAIRMAN BAGOFF: Thank you very much. And a little bit more housekeeping. (The chairman briefly addresses another applicant.) CHAIRMAN BAGOFF: Okay. Do any other members of the public have any questions for Mr. Pehnke about

Page 29

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 107 his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Okay. Zoom user, please state your name and address for the record. MR. COHEN: Yes. Lawrence Cohen, 20 Lincoln Avenue again. It seems like there’s an elephant in the room and I just realized it, so I have a question. If the traffic expert could -- I’m asking him if he could ask his employer, the Crestmont Country Club, to disassociate itself with the West Essex Highlands Garden Homes on this project because this town has a very polarized view of garden homes and the big apartment buildings that were planned there, and that the -- that the planning board by a -- a tie vote -- CHAIRMAN BAGOFF: Sir, you -- you may ask a -- you may ask a question -- MR. COHEN: Well, that’s the question -- CHAIRMAN BAGOFF: -- about his testimony. Sir? MR. COHEN: Would you be -- would you be willing to ask your employer to try to disassociate and not take any money from Garden Homes -- CHAIRMAN BAGOFF: Sir? MR. COHEN: -- and just make this -- CHAIRMAN BAGOFF: Sir?1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 108 MR. COHEN: -- a traffic light for Crestmont? CHAIRMAN BAGOFF: Sir? Sir? Mr. Cohen. Mr. Cohen? MR. COHEN: Huh? CHAIRMAN BAGOFF: Mr. Cohen? MR. COHEN: Yes. CHAIRMAN BAGOFF: Mr. Cohen? Mr. Cohen? Okay. MR. COHEN: Yes. CHAIRMAN BAGOFF: Here’s the rules. Here’s the rules. You can ask him a question about his testimony this evening. That is a -- not a question for him. Okay? I want to be cl ear. I want to keep the record clear. MR. COHEN: No. He had testimony that there was payment made by West Essex Highlands -- CHAIRMAN BAGOFF: You’re asking him a legal question about -- about business decisions. He can testify about payments but not who -- which employer, employee, company is going to do what with their businesses. He didn’t testify to that -- MR. COHEN: No, I’m -- CHAIRMAN BAGOFF: -- Sir. MR. COHEN: Okay. I’m just asking if he could ask his employer to consider --1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 109 CHAIRMAN BAGOFF: That is -- that is -- MR. COHEN: -- disassociating -- CHAIRMAN BAGOFF: Sir, that is not germane to his testimony. MR. COHEN: Okay. He mentioned that. He mentioned that connection, so. Okay.

Page 29

AN BAGOFF: That is -- that is -- MR. COHEN: -- disassociating -- CHAIRMAN BAGOFF: Sir, that is not germane to his testimony. MR. COHEN: Okay. He mentioned that. He mentioned that connection, so. Okay. That’s it. That’s all I have to ask because it’s -- it’s a highly controversial thing that West Essex Highlands is connected. Thank you. CHAIRMAN BAGOFF: Thank you very much, Sir. I appreciate that. Do you have any other questions for Mr. Pehnke on his testimony? ZOOM OPERATOR: So that was it for him. CHAIRMAN BAGOFF: I guess that’s a no. ZOOM OPERATOR: -- person is Deb’s iPhone. Please state your name and address for the record. DR. FRUCHTMAN-BUTENSKY: Yes. So it’s Deborah Fruchtman-Butensky, The Grande, Rappleye Court specifically. Can I ask the traffic engineer to please go through the route with me. Currently, I enter and exit through Oval Road to get to my house at The Grande. If I am traveling north on Laurel, there’s a traffic light. I wait at the light. I now make a right turn. 800 feet from that, there’s another traffic light. I want to make a left turn onto Oval1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 110 Road. Am I going to have to now wait again at the next traffic light to make my left onto Oval? MR. PEHNKE: There will be a traffic light at that location, but as you do today, you will queue to make a left instead of waiting for a gap in the opposing traffic -- well, as you do today at times, you’ll just -- as -- wait for a gap in the opposing traffic because the traffic will be flowing in both directions through the green arr -- green balls. Then you’ll make your left in. There’ll be periods of time where you reach the light and there’ll be a green arrow that will direct you to turn directly into Oval Road, unconflicted. And there will be potentially periods of time when you hit a red arrow and may be delayed a little bit in a protected left turn lane before you receive the green arrow that will turn you into O val Road. DR. FRUCHTMAN-BUTENSKY: Okay. That’s -- helps. So that’s significant. So there will be a left turn arrow to allow the left turn on Eagle Rock Avenue going eastbound to get into Oval Road from -- MR. PEHNKE: Yes. DR. FRUCHTMAN-BUTENSKY: Okay. So that’s very helpful. And do you have any idea -- when you say

Page 30

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 111 the coordination between the light at Laurel and Eagle Rock versus this particular light, can you be a little more granular in what you mean by that? MR. PEHNKE: So -- so basically, when we -- when we design a new traffic signal on a corridor, we want -- for instance, when the traffic is flowing eastbound on Eagle Rock Avenue as it approaches Laurel Avenue and has a green ball and travels through that intersection, you -- you want to design the signal in such a way that as it travels through that intersection and then reaches this intersection, it will continue uninterrupted. So you look to establish the timing of the intersection so that you have a continuous progression of traffic flow along the predominant movements through the two -- two intersections. In this case, we’re -- we’re looking at it a little more sophisticated because there is a heavy amount of traffic that actually turns to and from Laurel Avenue, so we’re going to look to progress through both phases. And it’s basically just to -- to make sure that we keep that movement traffic as you get your green ball and travel through the intersections, that you’re not, you know, hitting a red light, hitting a red light, hitting a red light, you just move through the system. That’s the intent of coordination and -- and synchronization.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 112 DR. FRUCHTMAN-BUTENSKY: Right. I understand that. That makes sense. Is there a computerized system which -- maybe on the road which measures how much traffic is going at a particular time of day? So is there variability in -- in the coordination of those two? Computerized variability? MR. PEHNKE: Traf -- traffic flow is relatively con -- consistent, so we’re able to set a timing directive that is -- is somewhat responsive to traffic flow, but it’s based upon the detectors at each -- at each intersection. And then the offsets are -- are measured from the -- the base -- the base phasing. So it -- it is factored in. It’s an analysis procedure to determine how the offsets are set on these coordinated systems and then of course, they can always be tweaked over time and that’s -- that’s an important aspect of it, too. That’s something that the county maintains and takes care of. DR.

Page 30

hese coordinated systems and then of course, they can always be tweaked over time and that’s -- that’s an important aspect of it, too. That’s something that the county maintains and takes care of. DR. FRUCHTMAN-BUTENSKY: Well, I’m trying to understand. Are there sensors in the road so that these things change during -- during peak flow and during the time of day, or are the -- MR. PEHNKE: So -- so there’s -- sensors in the road is -- is a past technology. There’s cameras, basically. Essex County uses video detection. So yes, there is video detections that’s used to identify when1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 113 a vehicle is present and provide green indications based upon its underlying established timing program. DR. FRUCHTMAN-BUTENSKY: So the goal is to help me continue to be able to get into the left lane and to smoothly be able to make the left based with the -- the green arrow. Correct? That’s -- MR. PEHNKE: That is -- that is correct. DR. FRUCHTMAN-BUTENSKY: That would be the coordination between the two intersections, ideally? MR. PEHNKE: That is correct. DR. FRUCHTMAN-BUTENSKY: Okay. Thank you. CHAIRMAN BAGOFF: Thank you very much. Do any other members of the public have not had a first question or a second question only? We’re not going to third questions as the hour grows late this evening and the applicant has other things to present. Does anybody have a first time not asking a question or a second time question? No third questions this evening? ZOOM OPERATOR: Okay. So yes, I will allow Keith Sly to please un-mute yourself and state your name and address for the record. MR. SLY: Keith Sly, Pleasantdale Chateau. I’ll try to brief, but if you’ll allow me, Chairman, a little bit of exposition to make the question more understandable, I’d like to piggy-back on Mr. Pannullo’s prior question of left turn into1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 114 Pleasantdale Chateau’s entrance. If presumably a large portion of our clientele arrive from 280 along Laurel Avenue, turning then right when the light is green onto Eagle Rock heading towards Pleasantdale Chateau, they then have to cross over to the left lane of traffic and then will arrive at the light at Oval Road if installed. When that light turns green, they will have to proceed another

File revisions (1)