Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 2, 2026

Crestmont_July_1_2026_Condensed_with_Keyword_Index

Preserved file SHA-2566b01a07575178f40ccc1c7fd2bb7800eee739e10fe0f22bab1042ebe5cb03c5a

Indexed text · page 27

Show all pages
Page 27

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 99 providing an accommodate -- accommodation from a sidewalk standpoint. There’s really no changes or impacts on any of the design features of a traffic signal. MR. PANNULLO: Okay. In -- in the prior application with regard to testimony on Oval Road and the widening or not, you represented to Essex Fells Country Club and were thanked for it by their counsel that in no circumstance would Oval Road need to be widened. Is that -- is that still the case? MR. PEHNKE: That remains true; yes. MR. PANNULLO: So is the applicant willing to stipulate that under no circumstance will Oval Road be widened? Or is that a question for counsel? CHAIRMAN BAGOFF: That’s a question for counsel, not for Mr. Pehnke. MR. PANNULLO: Okay. I’ll leave that stand. How many cars will it take going eastbound on Eagle Rock to turning left into the Pleasantdale Chateau to stack before they can’t make a left turn? MR. PEHNKE: I’m not sure I’m following that question. MR. PANNULLO: Traffic -- there are two ways into -- MR. PEHNKE: There’s two lanes eastbound1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 100 along Eagle Rock Road through the intersection. Are we talking at the Pleasantdale Chateau driveway? MR. PANNULLO: Yes, which -- yeah. Which I think you said was about 100 feet from the signal -- the new intersection. MR. PEHNKE: Yeah. It’s a little better than 100 feet from the stop bar. From the intersection itself, it’s -- it’s probably a little better than that, maybe 120 feet. MR. PANNULLO: So, four or five cars? MR. PEHNKE: Yeah. Gen -- generally, you look at 20 -- 20 to 22 feet per vehicle, so five -- say it’s a -- say it’s a little bit better than five vehicles. Yeah. MR. PANNULLO: Okay. I have one last point and that is that the -- the cost of the light is -- is in evidence before this board in PB-24-01, and that’s attached to this application. So the notion about the cost of the light is -- is on the applicant. It’s in evidence and I just wanted to make sure that was clear, because it was raised. Thank you. CHAIRMAN BAGOFF: Okay. Thank you very much. MR. PANNULLO: I’ll have other questions for you -- I’ll have other for your civil engineer, but we’ll do that later.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public

Page 27

h. MR. PANNULLO: I’ll have other questions for you -- I’ll have other for your civil engineer, but we’ll do that later.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 101 CHAIRMAN BAGOFF: Thank you very much. Do any other members of the public have any questions for Mr. Pehnke on his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Hey. Seth Weisleder, please state your name and address for the record. MR. WEISLEDER: Yes. Seth Weisleder, Howell Drive, West Orange, New Jersey. So, Mr. Pehnke, just to make sure I’m clear, your recommendation seems to be a lot on concerns, which you mentioned that word many times and I’m glad there our private and public entities that are concerned for the public safety and stuff, but the -- your recommendations for a new traffic signal is not based on documented crashes, pedestrian studies, or alternative analysis. Is that correct? MR. PEHNKE: No. It’s not correct. It’s -- it’s -- as I testified at the first meeting, it’s -- it’s based upon engineering study, which includes volume analysis, volume warrants. We meet an eight- hour warrant at that intersection. It’s based upon observations of the existing conditions at the intersection, including sight lines, the acute angles. Those are what have been taken into account. I didn’t delve into accident history because I wasn’t looking to1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 102 warrant the traffic signal based on accident history, and nor do I think we probably would get to the level. That’s a fairly substantial warrant. Quite frankly, I’ve very rarely used that in my career. But the engineering study that’s been done is based upon the methodologies and the Manual of Uniform Traffic Control Devices, which is -- includes looking at the existing conditions, the geometry, the traffic control, the traffic volumes, and all of that is weighed into the determination that this is an appropriate location for -- for improvement and traffic signalization. MR. WEISLEDER: Giv -- given that this is a Crestmont Country Club application for Crestmont Country Club for the parking lot and other things, did you take into account or do a traffic study of the number of cars actually going in and out of Crestmont Country Club alone? MR. PEHNKE: I do have volume data that -- that we have

Page 27

nd other things, did you take into account or do a traffic study of the number of cars actually going in and out of Crestmont Country Club alone? MR. PEHNKE: I do have volume data that -- that we have in our records that we’ll be using for the design of the tra -- final traffic signal timing. As I testified to earlier, that varies throughout the day. It’s relatively low in the morning. It ramps up in the evening. And then certainly, there is event-type traffic that occurs a little more randomly, so to speak.

File revisions (1)