Supporting Documentation · Dec 2, 2026
Crestmont_July_1_2026_Condensed_with_Keyword_Index
6b01a07575178f40ccc1c7fd2bb7800eee739e10fe0f22bab1042ebe5cb03c5aIndexed text · page 24
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 87 today. DR. FRUCHTMAN-BUTENSKY: But -- except there’s no need to cross, as somebody else said. I mean, I live there, I walk every day. MR. PEHNKE: With -- with all due respect, there’s no need to provide a cross until somebody is injured and hurt. DR. FRUCHTMAN-BUTENSKY: But then why don’t we do it at -- MR. PEHNKE: This -- this improvement provides the mechanism to provide a safe crossing. There’s no argument that -- that -- DR. FRUCHTMAN-BUTENSKY: Why don’t we do it at The Cliffs? Why are we ar -- artificially, arbitrarily doing it at Eagle Rock Avenue where I’m not convinced, and I’d like to see the studies that show that you’re saying it’s going to be an improvement for my egress and ingress every single day because I use Eagle Rock Avenue on a daily basis. Where can we see those traffic studies? MR. PEHNKE: The study’s in the record, so it’s available for inspection. Certainly, the county will have the advantage of the study and their own knowledge of the intersection. And everything on the -- the plans are available for inspection and are1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 88 finding -- are following proper design standards. DR. FRUCHTMAN-BUTENSKY: And it seems like we’re doing a whole lot of revamping and a lot of variances. I ask you again, and I know you’ve answered it, but why did we never evaluate a right turn only egress so we don’t need this light? MR. PEHNKE: I defer to the record of the last meeting that also laid the foundation as to the overall objectives of this project, which isn’t just the driveway. It ties into the improvements at Oval Road, so it’s a bigger package. DR. FRUCHTMAN-BUTENSKY: Well, you’re saying it’s an improvement. How do we know it’s -- it’s not a detriment? I mean, there’s -- MS. McGOVERN: (Indiscernible.) DR. FRUCHTMAN-BUTENSKY: -- engineer -- engineer -- traffic engineer? How are you proving that -- that it’s an improvement? It’s a development. It’s a change. But how are we saying it’s not an im -- it’s not a detriment to the traffic? MR. PEHNKE: Because there are identifiable substandard conditions which I’ve walked through during the last meeting and rehashed this evening at those intersections. They’re readily observable by an engineer as well as the public. There are
le substandard conditions which I’ve walked through during the last meeting and rehashed this evening at those intersections. They’re readily observable by an engineer as well as the public. There are engineering1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 89 studies we’ve done from an analysis standpoint to look at the operations of the intersections. There are standards that the transportation industry and all of the transportation agencies utilize to evaluate -- DR. FRUCHTMAN-BUTENSKY: Well, concretely, I want to know is -- is there a difference between improvements for the country club people versus improvement for us residents who reside at The Grande and The Highlands, because -- MR. PEHNKE: Because -- DR. FRUCHTMAN-BUTENSKY: Have you considered the impact to the residents alone versus your statements purporting to be improving the egress and ingress to the country club? MR. PEHNKE: Ab -- absolutely. The improvements without a doubt provide safety improvements and operational improvements both to the motoring public traveling along Eagle Rock Avenue through the intersection, people traveling into and out of Oval Road, including The Grande and the Chateau, and people egressing from the country club. All of them -- all of those elements benefit from the improvement. The safety improvements include separating the left turns along Eagle Rock Avenue into a separate left turn lane by widening onto the country1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Public Questions 90 club and having the impact on the country club which triggers some of the -- the variances that have been requested. That is a very simple toolbox that is encouraged by transportation agencies and all design documents. It’s a -- it’s a basic tenet of intersection design to -- to provide that safety, widening for the left turn lanes. That’ll benefit everybody turning onto Oval Road. The traffic signal control will provide improved and enhanced operation of the ability to egress Oval Road -- Oval Road and the -- the country club under signal protection. And -- DR. FRUCHTMAN-BUTENSKY: I understand what you’re saying, and you realize that you’re being paid for and advocating for the country club. I would suggest that the planning board please hire an independent traffic assessor to assess the veracity of Mr. Pehnke’s
d you realize that you’re being paid for and advocating for the country club. I would suggest that the planning board please hire an independent traffic assessor to assess the veracity of Mr. Pehnke’s studies. That’s what I -- MR. PEHNKE: So that is -- that is done. It is done by the fact that the county engineer and the county traffic engineer, whose jurisdiction the intersection lies, does a full review in accordance with the same standards that I utilize. We are all professional engineers. While I may be a paid
File revisions (1)
- Nov 20, 2026
6b01a0757517410,140 bytes