Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 2, 2026

Crestmont_July_1_2026_Condensed_with_Keyword_Index

Preserved file SHA-2566b01a07575178f40ccc1c7fd2bb7800eee739e10fe0f22bab1042ebe5cb03c5a

Indexed text · page 34

Show all pages
Page 34

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy 127 ZOOM OPERATOR: Again, I’m just seeing -- Art Butensky, can you un-mute? Okay. I am seeing none. CHAIRMAN BAGOFF: Okay. Well, seeing none, give Mr. Butensky one more try. Mr. Butensky, can you un-mute, Sir? MS. McGOVERN: I think he’s gone. ZOOM OPERATOR: Yeah. He’s gone. CHAIRMAN BAGOFF: He’s gone? Okay. We’re going to close this portion of the meeting. Mr. Schkolnick, you’re up. MR. SCHKOLNICK: Thank you, Mr. Chairman. Could -- could we take judicial notice that the United States has defeated Bosnia 2 to 0 in the World Cup? CHAIRMAN BAGOFF: The chair takes notice. MR. SCHKOLNICK: We’ll -- we’ll get started, I guess. Chairman, what time do you want to go to? CHAIRMAN BAGOFF: 10:50. MR. SCHKOLNICK: We’ll try to get started, I guess. CHAIRMAN BAGOFF: Okay. MR. SCHKOLNICK: Call John Cote. MR. COTE: Good evening. CHAIRMAN BAGOFF: Good evening. MS. McGOVERN: Okay, Mr. Cote. Please -- MR. COTE: I have previous -- MS. McGOVERN: Please raise your right hand.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy 128 MR. COTE: All right. Yeah. MS. McGOVERN: Do you swear or affirm -- MR. COTE: I was sworn in last time. I don’t know if you want to keep that or not. MS. McGOVERN: Oh. I didn’t realize that. Dr. Bagoff, do you want him to be re-sworn or -- CHAIRMAN BAGOFF: No. MS. McGOVERN: -- just remind him that he’s under oath? CHAIRMAN BAGOFF: Do you -- you understand you’re still under oath, Sir, and your license is still good in the state of New Jersey. Is that correct? MR. COTE: Yes. That is correct. CHAIRMAN BAGOFF: Okay. Good enough for me. Go for it. MR. SCHKOLNICK: Thank you. MR. COTE: So what I’m going to do is we’re going to just go through the plan set, the site civil plan set that was delivered in concert with what both -- both Ms. Cancellaro talked about as well as Mr. Pehnke in their testimony. And I’ll tie back into -- MR. SCHKOLNICK: Okay. John, I’m sorry. I just want the board to confirm that you were qualified as an expert and we don’t have an issue with that. I apologize. MR. COTE: Sure.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 129 MR. SCHKOLNICK: Chairman, we did qualify him. I want to make sure that’s recognized for the record so we don’t -- CHAIRMAN BAGOFF: Yes. Yes. Everything that we did last time still follows

Page 34

- Direct 129 MR. SCHKOLNICK: Chairman, we did qualify him. I want to make sure that’s recognized for the record so we don’t -- CHAIRMAN BAGOFF: Yes. Yes. Everything that we did last time still follows through. MR. SCHKOLNICK: Okay. I just don’t want to have an issue with that. I’m sorry. DIRECT EXAMINATION BY MR. SCHKOLNICK: Q Okay. Thank you, John. A All right. So what I’m going to do is I’ll share my screen and we’ll go through the -- the plans here. Q John, if you’d call out the sheet number and the last revision date. A Sure. So this is the first drawing we put up last session, last hearing, and it’s exhibit A-1 now in terms of the -- the reference and it’s drawing lab -- excuse me, labeled “Project Aerial Map”. Exhibit EX-05 is the drawing number on it and it’s dated June 1st, 2026. And that’s consistent with what we’ve presented previously. And this is, again, just for orientation. Looking at the site with the north to the right of the site. The location of the area in question for the bulk of our improvements is located again between Laurel and Eagle Rock Avenue and we’re going to spend -- I’ll go through my components of the on-site related1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 130 improvements. So I’m going to switch now to the site plan set proper, and when we talk about the site, we talk about the east and west side of the site in terms of the way the sheets are set up. Orientation-wise, the Laurel Ave and Eagle Rock intersection is on the westerly sheet and then Oval and the -- the driveway is on the eastern side -- eastern side. So, the westerly portion of the site consists of a number of improvements, starting with the addition of a stormwater basin located along -- at the intersection of Laurel and Eagle Rock Avenue. That basin will serve multiple purposes for the -- certain terms of both water quantity, water quality, treatment for the site. As you progress -- as you weigh in -- into the site through the entrance off of Laurel, as you come up to towards the porte cochere to the main entrance to the building, we’re looking to propose an additional parking area adjacent to the existing parking and I’m going to refer to this parking as the upper level parking because that will be in reference to what we’ll see on the next drawing. And in that area, we’re proposing 39 parking spaces, and they’ll be

Page 34

m going to refer to this parking as the upper level parking because that will be in reference to what we’ll see on the next drawing. And in that area, we’re proposing 39 parking spaces, and they’ll be integrated to connect into the existing parking lot that’s there today as an add-on basically pushing, more or less, the extent of the parking to the north on the site.

File revisions (1)