Supporting Documentation · Dec 2, 2026
Crestmont_July_1_2026_Condensed_with_Keyword_Index
6b01a07575178f40ccc1c7fd2bb7800eee739e10fe0f22bab1042ebe5cb03c5aIndexed text · page 35
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 131 I’ll refer to more content relative to the design of each of the elements, but basically, we’re providing within that -- the 39 parking spaces in this area, two EV parking spaces. And I’ll just touch on really quick, I’m going to kind of divert to some comments that were made from the engineers’ and planners’ letters, and in particular, one of the EV spaces here will require to be an ADA EV -- EV space and we’re going to provide that EV ADA space on the existing EV -- excuse me, existing ADA space on the site. So we’ll accommodate that requirement for one EV being an ADA space on the existing handicap space or ADA space on the site today. So, looking at the orientation of the left-hand side, you’ll see -- the western side, you’ll see the combination of the -- the basin and the parking lot. There are representations of where the walls are, and I’ll talk a little bit more about that when we get into the design -- elements. And then there’s the -- the widening of Eagle Rock Ave. And part of that is to grade Eagle Rock Ave in accordance with Mr. Pehnke’s testimony to level off the area adjacent to the roadway. To provide that level area, we’re proposing a wall along the frontage, and that wall will run the length of the Eagle Rock Ave from Laurel Ave into the new intersection being1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 132 proposed. I’m going to now switch to the easterly sheet site plan, and I apologize. I will state the sheet numbers. The first -- and do you want to tell me if you want to make the set A-2, or do you want to make -- Q No. No, no, no. A -- the set -- each one individually will be -- individual. Okay. So we’re going to -- Q We’re -- we’re not re-marking, John. These are already -- A Understood. Q These are in the record. A These are in the record. Okay. I just want to make sure. All right. So then the easterly partial site plan is now what I have on the screen, and the easterly partial shows the intersection that we’ve been referring to in the earlier testimony by Mr. Pehnke, Eagle Rock Ave. And it also shows the on-site improvements relative to the new egress drive. The new egress drive starts at the upper level parking lot and progresses down to the new intersection with Oval. That roadway will be a 24-foot
on-site improvements relative to the new egress drive. The new egress drive starts at the upper level parking lot and progresses down to the new intersection with Oval. That roadway will be a 24-foot wide connection into there, providing the two lanes, a left and a right and a through movement exiting out onto Eagle Rock Avenue. In doing that, there’s an underlying arching area1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 133 that I’ll call the lower level that we’re modifying. In reconfiguring that parking lot, we’re basically creating a 64-space parking lot in that lower level that now connects to the new egress drive and maintains the existing connection to the upper level parking lot that’s along the -- the south center portion of that lower lot. That lot will also provide -- there’s an area where we’re providing water quality measures, porous pavement along a northern portion of that, and that’ll tie into some of our water quality measures that we’re providing for the site. One note here for the purpose of the variance, we do have a location where fence is locat -- guide rails located within less than five feet of a parking space and the reason for that configuration is based upon the previously-approved modular structure that was built there to provide a separation between the parking spaces and the pedestrian movements to that building. So that’s one element of a variance that we’re asking for. Looking at the site in the -- in that northern -- I’m sorry, the eastern edge on the northern side, we are proposing another detention basin. This detention basin, again, similar to the one that’s at the corner of Eagle Rock and Laurel, will be to treat -- for both1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 134 water quality and water quantity for the purpose of balancing out the stormwater and achieving compliance with the stormwater regulations. One item to point out relative to the site plan, the combination of these two sheets is that the existing site today has 256 parking spaces. The prior variance that was granted for this site was actually granted at 252, but a physical count of the spaces out there yielded 256. Based upon the 256, we’re adding an additional 36 spaces and I’m going to qualify those 36 spaces be -- it’s 32 physical spaces that we’re adding in total, the net between
paces out there yielded 256. Based upon the 256, we’re adding an additional 36 spaces and I’m going to qualify those 36 spaces be -- it’s 32 physical spaces that we’re adding in total, the net between the revisions of the new parking lot as well as the lower -- reconfiguration of the lower lot and four of those total spaces are what are referred to as the EV credits so that for each EV space, we have a credit of one additional parking space counting towards our parking compliance. That is a part of that calculation. So there will be physically, for the record, 288 spaces built, total, and completed with the additional spaces, and the additional four towards the parking count that’s part of the variance request here to get us to 292 are those EV credit spaces. So then -- Q When you -- John, when you say variance request, there’s already a deficit.
File revisions (1)
- Nov 20, 2026
6b01a0757517410,140 bytes