Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 139 The walls along Eagle Rock Avenue from the pull- back of the grades that Mr. Pehnke referred to earlier create an approximate eight to nine-foot high wall that’ll be along Eagle Rock Avenue from the corner of Laurel and Eagle Rock to the new access drive, or, excuse me, new egress drive. So from a grading point of view, you know, we had the existing driveways that are -- that are out there today that was referred to multiple times as the acute angle driveway. That is being removed in its entirety. Those slope conditions will be gone relative to that, but we are keeping the 10-and-a-half percent existing drive that we’re keeping, tying in the lower level and the upper level parking lot. So the variance also speaks to the 10-and-a-half percent that is on the driveway that’s existing but being slightly modified but not steeper to keep the connection between the two drive -- two parking lots. Going from the -- you know, the area associated with the -- both the detention basins, handling both the parking lots and the new driveway, I’ll look at the -- I’ll flip now to the drainage plan, the bio- retention -- small-scale bio-retention basin basically is going to serve that water quality and water quantity reduction. We are tying in drains that were previously just sheet-flowed out from the site and connecting them1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 140 -- and the idea behind this is basically to get everything into the pipes as opposed to having it sheet-flow over Eagle Rock Avenue and -- which would help relative to potential icing conditions and things along that lines in terms of safety on Eagle Rock Ave. When I look at the eastern side, it’s a similar scenario. You have another small-scale bio-retention basin. We are going to be planting one basin with woody vegetation; that’ll provide part of the discussion about what we’re doing for landscaping and I’ll get into that in a little bit, but the idea behind these is that the bio-retention provides that water quality in concert with the porous pavement that’s proposed in the parking lot. And again, all of these measures, the retention basins, the porous pavement, and -- and everything else that’s been tied together is to achieve compliance with your current stormwater regulations. So then
again, all of these measures, the retention basins, the porous pavement, and -- and everything else that’s been tied together is to achieve compliance with your current stormwater regulations. So then what I’m going to talk about here is the tree count and the tree removal and replacement. So I’m now switching to the partial tree removal plan, and what that does is identifies trees that are within the limit of the disturbance that are -- are -- that are basically being removed and then the -- using the town’s calculations for replacement based upon the diameters of the existing trees, the condition is we’re1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 141 removing 313 trees. And as a function of the replacement ratios that are required by the town by the ordinance, we’re going to be putting back a total of 486 trees. Now, I’m going to modify that by 11 the way this plan refers to the 400 -- 586 trees to address a comment from your engineer that the 11 or (indiscernible) planner. I apologize. That the 11 trees we counted for compliance with your landscape in parking lot requirements, we’re going to not take credit for those as replacement trees, we’re going to add 11 more trees. So this will be a count of 597 trees for the purpose of the replacement trees. Q So John, what -- A Those trees -- Q John, what -- what sheet are we on? And -- A So I am on -- I’m on -- I apologize. I’m on the partial tree removal plan, which is LD-101. Q Okay. And you’re making a -- an oral amendment here to basically saying we’ll comply with the -- A To address the comment. Yeah. Q Just, you’ll comply with the review letter and add -- A That’s correct. Q -- 11 more trees because of the -- the way1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 142 the calculation was done. We’re -- we’re happy to add the 11 additional to the 586 -- A Correct. Q -- already. A Correct. Q Okay. A And then, you know, again, based on the ratios, we’re at the 586 but in particular, the way the trees are being replaced, we have them in a combination of locations on the site. So there’s a summary table on the plan identifying the 586 trees and the placement relative to the areas where we’re doing our bulk improvements up along Eagle Rock Ave and Laurel and the parking areas that are being reconfigured as well as then on the whole -- Crestmont
e placement relative to the areas where we’re doing our bulk improvements up along Eagle Rock Ave and Laurel and the parking areas that are being reconfigured as well as then on the whole -- Crestmont property as a whole. So 303 trees will be placed along that frontage area and an addition 239 trees will be placed on the overall Crestmont property. And then to get to the full count, we had proposed 44 trees off-site in coordination with your forester for the -- to hit the 586. But that 44, to the -- to an amend -- oral amendment of this plan, will become 55 to get the additional 11 trees that we proposed. So we’ll have a total of the 597 trees to be planted as associated with this application. So what I’ll do now is I’m going to talk a little
File revisions (1)
- Nov 20, 2026
6b01a0757517410,140 bytes