1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 151 like the example I was referring to earlier, we are imposing a wall along this portion of where the steep slopes are for the -- in order to minimize that disturbance. These walls, for the purpose of, you know, record, will become -- you know, they’ll be designed and have to be approved by the building department for the purpose of construction of the walls so the -- the idea behind this is that they’ll -- there’ll be a -- the safety factor associated with the walls is built into that design and that would have to be, again, reviewed by the building department as a function of the -- the construction. So we have a second level of -- of review on that as that -- that comes to bear if this project were to be approved. Additionally, transitioning from the upper level parking lot down to the lower level parking lot, we have an area where we’re traversing that slope, so in or der to smooth that slope out to make it a drivable en -- exit maneuver, we have to put the walls as well as the roadway through, again, portions of the steep slopes to make -- to allow for that exit maneuver. And then on a similar note, along Eagle Rock Ave, the area that we are leveling off is that steeper slope that you see out there today from where the curb line is out to the top of the slope, pulling that back and1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 152 imposing a retaining wall along the length of that in order to create the safe -- I can’t think of the right term for it, but the safe zone from the curb line to the -- to the -- where the wall is proposed. I may not be using the right term, but Karl Pehnke’s description earlier about that more leveled-off area adjacent to the roadway is -- is part of the technical design for the -- for compliance for the county’s purpose. So from a steep slopes point of view, you know, the .38 acres that we’re disturbing associated with the total of the 3.8 acre areas that are 25 percent or greater are, again, associated with minimizing disturbance, allowing the roadway access to make its way through and allow for the proper design of the off- site roadway, Eagle Rock Avenue. The last item we had was the maximum driveway slope, section 25-28.8.f.8 where six percent is allowed and we’re proposing a combination of both eight and

Page 40

n of the off- site roadway, Eagle Rock Avenue. The last item we had was the maximum driveway slope, section 25-28.8.f.8 where six percent is allowed and we’re proposing a combination of both eight and a half and ten and a half. The ten and a half is the existing condition that’s there today and the eight and a half is along our main driveway. And again, the -- the difficulty on this si te was to connect the grades at a county-compliant access point to Eagle Rock Avenue with grades in the ranges going from the five percent coming off of this intersection through to eight and a half percent back1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 153 to the grades that tie into the upper level parking, and that’s what creates the condition for the eight and a half percent. And again, the ten and a half is existing. The section 25-14.1, the lighting I spoke to earlier, if that is a variance, we will request that, again, if -- if necessary, again, providing safety for both vehicular and pedestrian movements through the intersection. We do also have requests for a site plan waiver regarding the removal of trees on the 10 percent slopes or greater. If you look at this plan, there’s a significant amount of 10 percent slopes throughout the area, so those trees, again, are not only -- they’re being removed, but they’re also then being replaced with the multiplier that the town has for the restoration component of it. So, again, it’s associated with the grading needed from Eagle Rock Avenue even, again, trying to minimize grades and impacts associated with the new parking lot and the driveways. So those trees being removed in those areas are -- are associated with the -- again, trying to minimize those for where we need to put the various improvements in. So, I believe that’s the heart of my testimony. I1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy 154 wanted to keep it concise. If there’s any questions from there or any additional information I need to provide, I’m, you know, happy to provide any additional content. MR. SCHKOLNICK: Are you anticipating any questions, Mr. Cote? CHAIRMAN BAGOFF: At this hour, Mr. Cote, Mr. Schkolnick, we’re going to carry this and the board will ask questions the next time. I recommend we carry this to the September 2nd regular planning board meeting at 6:30 p.m. via Zoom. Will

Page 40

ote, Mr. Schkolnick, we’re going to carry this and the board will ask questions the next time. I recommend we carry this to the September 2nd regular planning board meeting at 6:30 p.m. via Zoom. Will that work for you, Mr. Schkolnick, and your experts? MR. SCHKOLNICK: Chairman, could we -- could we advise at a later time if we want to go -- CHAIRMAN BAGOFF: Yes. MR. SCHKOLNICK: -- by Zoom? CHAIRMAN BAGOFF: Well, I’m going to -- I’m going to -- I want to post it. We can change it. MR. SCHKOLNICK: Okay. CHAIRMAN BAGOFF: Is that okay, Ms. -- MS. McGOVERN: No, no. Hold on. CHAIRMAN BAGOFF: -- McGovern? MS. McGOVERN: If -- if you’re going to carry it and then change it, then they’d have to do all new notices again. Right? CHAIRMAN BAGOFF: SO if we car -- we can