Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 6, 2015

11-15 Exhibits to Resolution Awarding Contract for 911 System Maintenance and Repair.pdf

Preserved file SHA-256c64ab1e2bb206146c4660bc566c5f1e4fca8ca686497d1305ceee0ffc4e0b340

Indexed text · page 29

Show all pages
Page 29

• ANSI/TIA/EIA 568-B.1 - Propagation Delay and Delay Skew Specifications for 100 ohm 4-Pair Cable • ANSI/TIA/EIA 568-B.1-5 - Transmission Performance Specifications for 4-Pair 100 ohm Category 5E Cabling. • ANSI/TIA/EIA 569 Telecom. Pathways and Spaces • ANSI/TIA/EIA 606 - The Administration Standard for the Telecommunications Infrastructure of Commercial Buildings • ANSI/TIA/EIA TSB 67 - Transmission Performance Specifications for Field Testing of Unshielded Twisted Pair Cabling Systems. • ANSI/TIA/EIA TSB 75 - Additional Horizontal Cabling Practices and Standards for Open Offices • Building Industry Consultant Services International (BICSI) – Telecommunications Distribution Manual. • NEMA –National Electrical Code • NENA – National Emergency Number Association - Technical Standards • IEEE - 802.3 • National Fire Protection Association (NFPA) - NFPA-70 National Electric Code. • Underwriters Laboratory (UL) Standards D. Installation must be compliant with: • N.J.A.C. 5:23 • N.J.A.C. 6.22 • N.J.A.C. 17:24 • N.J.S.A. 18A:18 • Boca National Building Code E. Surge Compression and Line Conditioning Standards must conform to: • ANSI Standard C62.41. • IEEE Standard 587 • UL 1449 Standards for Safety: Transient Voltage Surge Suppressors. • Federal Information Processing Standards (FIPS) Publication 94: Guidelines on Electrical Power for ADP Installations 9/83. • NFPA 78: Lightning Protection Code for Buildings. 3.9 PROJECT ENGINEERING/MANAGEMENT, SITE MANAGEMENT Basic system design and installation resources must be included in the cost of the equipment purchased. Using agencies may require custom design of systems and basic and custom installation resources. Hourly rates for these services must be established at the time of response to this RFP. Contractors shall provide a written proposal to the using agency specifying all service charges in advance of the purchase of the equipment/system. Any custom design work, site modification, or

Page 29

s RFP. Contractors shall provide a written proposal to the using agency specifying all service charges in advance of the purchase of the equipment/system. Any custom design work, site modification, or system integration will remain within the confines of the Purpose and Intent of this RFP. Pricing for Project Engineering/Management and Site Management shall be quoted on Schedule K. 3.10 TRAINING The Contractor shall provide training and manuals (hard copy and electronic) for all equipment and system operation immediately following system installation. Upon request, the Contractor shall provide a training outline to the using agency. It is expected that an individual, other than 23

File revisions (1)