MATRIXNEWORLD Enabling Progress COSTS The following are our estimated costs for the tasks described herein. FIRE HOUSE NO. 1, VALLEY ROAD TASK 1: SOIL DELINEATION AND TEMPORARY WELL INSTALLATION Labor ........ Direct Expenses $13,250.00 - $15,630.00 Subtotal Task TASK 2: MONITORING WELL INSTALLATION Labor ........ Direct Expenses $9'850.00 "$12,360.00 Subtotal Task TASK 3: WELL GAUGING AND GROUNDWATER SAMPLING Labor... Direct Expenses.. $3,280.00 Subtotal Tas! TASK 4A: SUB-SLAB SOIL GAS SAMPLING AND REPORTING, IF REQUIRED Labor ‘Subtotal Task 4A. TASK 4B: INDOOR AIR SAMPLING AND REPORTING, IF REQUIRED Labor .... Direct Expenses Subtotal Task 4B TASK 5: UPDATED ECOLOGICAL EVALUATION Subtotal Task 5 - $1,650.00 TASK 6: WELL SEARCH, IF REQUIRED Labor... sone . Direct Expenses .........00 Subtotal Task 6 - TASK 7: REPORTING AND LSRP MANAGEMENT Labor ....... Direct Expense: Subtotal Task 7 .. Estimated Cost for Scope of Work at Fire House No. 1 OAI3-GI8E - Township of West Orange - LSRP Secvices\Proposal\Revised Sail and GW RI - December 2014\80if and GW RI- December 2014.00 6
MATRIXNEWORLD Enabling Progress FIRST AID SQUAD BUILDING, 25 MT. PLEASANT PLACE TASK 1; MONITORING WELL INSTALLATION Labor ........00 Direct Expense: Subtotal Task 1 TASK 2: WELL GAUGING AND GROUNDWATER SAMPLING Labor «eee sees J see sone Direct Expenses Subtotal Task TASK 3 —- CONFIRMATORY GROUNDWATER SAMPLING, IF REQUIRED Labor....... Direct Expense: Subtotal Task TASK 4: REPORTING AND LSRP MANAGEMENT Labor ... Direct Expense: Subtotal Task Estimated Cost for Scope of Work at First Aid Squad Building. DOGWOOD PUMP STATION, 794 NORTHFIELD AVENUE TASK 1: COMPLETION OF ONE SOIL BORING Labor .... Direct Expenses Subtotal Task TASK 2: REPORTING AND LSRP MANAGEMENT Labor... Direct Expenses... $160.00 ul fas! Estimated Cost for Scope of Work at Dogwood Pump Station...... TOTAL ESTIMATED SCOPE OF WORK (ALL SITES)...e-ssessssersssvsssseesesessrsneersesssereseseeesers 983,270.00 ASSUMPTIONS ‘This proposal is based on the following assumptions: = Costs assumes that all areas will be accessible; = One day for soil borings, one day for temporary well installations and two days for the monitoring well installations is budgeted; = Costs assume that the one soil boring at Pump Station would be completed the same day as the soil borings at Fire House No. 1; = Costs assume that a well search at First Aid Squad Building will not be required; OAL3-61RE - Township of West Orange - LSRP Services\Proposal\Revised Soif and GW RI - December 2014\Soil and GW RI - December 2014.doe. 7 aneek.
MATRIXNEWORLD Enabling Progress = Costs only include the initial groundwater sampling following the installation of permanent monitoring wells, if required; = Costs do not include any soil, groundwater, ecological or vapor intrusions investigations, remediation or groundwater monitoring beyond the items described in this proposal; = Costs assume all work to be completed on-site and in Level D-modified personal protection equipment; = No additional assessment or investigation activities beyond the preparation of a RJR, NIDEP SRP forms and CID, or an unrestricted use AOC RAO identified in the scope of work are included; = Costs do not include future soil or groundwater remediation, if required; = Costs include the disposal of up to twelve 55-gallon drums from the Fire House No. 1 and up to 4 drums from the First Aid Squad Building (non-hazardous); = Costs include well surveying and completion of NJDEP’s Form B’s; = Costs assume that only one set of indoor air samples will be collected; = Costs exclude an ecological risk assessment, if required; and = The Client is responsible for payment of all NJDEP fees. All work will be conducted in accordance with our existing agreement with the Township. Matrix is prepared to implement the described Scope of Work upon receiving your authorization to proceed. If you have any questions, please feel free to contact us at (973) 240-1800. Sincerely, Form Qotouny, Oh C Rose V. DeLorenzo, CHMM Robert Meisner, LSRP Project Manager Senior Project Manager Edward Sullivan, P.G., LSRP Director of LSRP Program Authorization to Proceed: Date: Name/Title Purchase Order No.: ‘OA3-618E - Township of West Orange - LSRP Services\ProposaliRevised Soil and GW RI - December 2014\Soil and GW RI - December 2014.doe 8
File revisions (1)
- Sep 29, 2026
5adfb0b64d80369,918 bytes