Supporting Documentation · Jan 27, 2015
44-15 Proposal.pdf
5adfb0b64d80458cef00b36dd53920d6647f6068216da905b18511b66c89fa8aIndexed text · page 8
Show all pagesMATRIXNEWORLD Enabling Progress = Costs only include the initial groundwater sampling following the installation of permanent monitoring wells, if required; = Costs do not include any soil, groundwater, ecological or vapor intrusions investigations, remediation or groundwater monitoring beyond the items described in this proposal; = Costs assume all work to be completed on-site and in Level D-modified personal protection equipment; = No additional assessment or investigation activities beyond the preparation of a RJR, NIDEP SRP forms and CID, or an unrestricted use AOC RAO identified in the scope of work are included; = Costs do not include future soil or groundwater remediation, if required; = Costs include the disposal of up to twelve 55-gallon drums from the Fire House No. 1 and up to 4 drums from the First Aid Squad Building (non-hazardous); = Costs include well surveying and completion of NJDEP’s Form B’s; = Costs assume that only one set of indoor air samples will be collected; = Costs exclude an ecological risk assessment, if required; and = The Client is responsible for payment of all NJDEP fees. All work will be conducted in accordance with our existing agreement with the Township. Matrix is prepared to implement the described Scope of Work upon receiving your authorization to proceed. If you have any questions, please feel free to contact us at (973) 240-1800. Sincerely, Form Qotouny, Oh C Rose V. DeLorenzo, CHMM Robert Meisner, LSRP Project Manager Senior Project Manager Edward Sullivan, P.G., LSRP Director of LSRP Program Authorization to Proceed: Date: Name/Title Purchase Order No.: ‘OA3-618E - Township of West Orange - LSRP Services\ProposaliRevised Soil and GW RI - December 2014\Soil and GW RI - December 2014.doe 8
File revisions (1)
- Sep 29, 2026
5adfb0b64d80369,918 bytes