Supporting Documentation · Apr 10, 2018
103-18 Attachment - EZRA.pdf
28fa7678d590dc6bb129cde47e30d46c0e310b18de415c57380c85c0f1700623Indexed text · page 7
Show all pagesENGINEER'S COST ESTIMATE LINCOLN AVENUE EXTENSION MAJOR SUBDIVISION BLOCK 175.09, LOTS 2 & 4 LINCOLN AVENUE ITEM NO. DESCRIPTION. QUANTITY unit [UNIT PRICE] amount 1 [Maintenance & Protection of Traffic TS is $600.00 "$800.00 @ JB Conc. Surface Course, 2 Thick 758 TONS 365.00} 315,176.00} 3 [Storm Inlet Retention Chamber z ONT | $7,500.00 $15,000.00 4 [ROPE Pipe LF $27.00 $702.00 & _ |Soi Erosion Contrel TS Ts "$500.00} ‘$600.00 @ [Shade Tress 5 ER '$250.00] $7,250.00 7 [Monuments cy ER $200.00} {$800.00 8 _|Concrate sidewalk, 4 & 6 Inches Thick 140 sy $48.00} $4,950.00 TOTAL $96,877.00 J2oy4(NISA 40:850-530.(1) $7,378.40 [TOTAL PERFORMANCE IGUARANTEE $44,252.40 40% CASH GUARANTEE $4,425.26 80% LETTER OF CREDIT $39,827.16 45% MAINTENANCE GUARANTEE $6,637.86 Tawk Mase rte. MGI | J R Say dec IF2@ oP ° Coa sons WE, wet
File revisions (1)
- Sep 29, 2026
28fa7678d5901,474,462 bytes