Supporting Documentation · Apr 24, 2018
112-18 Additional Attachment 4.24.18.pdf
ebda9f3bcbaf27ea201d640d72319f762252c7ec4ebc36b1f51694f89372afb2Indexed text · page 3
Show all pagesIMPROVEMENTS AND RENOVATIONS TO THREE WEST ORANGE FIRE STATIONS DESIGN, SPECIFICATIONS, BID DOCUMENTS BID ANALYSIS CONSTRUCTION INSPECTION CONSTRUCTION MANAGEMENT AND ADMINISTRATION Fire Station No. 3 93 Ridgeway Avenue i. SITE A. New barrier free code complaint ADA front entrance 2. BUILDING EXTERIOR A. Administration, dormitory, kitchen wing i New roof 2 New skylights, with shades 3 New exhaust fans & curbs 4. Reroute cables and wires so as not to rest on roof with proper entry points 5s New roof drains with additional drains added as necessary 6. New aluminum fascia caulking 7. New parapet coating 8. New chimney flashing 9. Repair/replace/repaint flagpole 10. Repair leak into basement by louvers 11. New Bilco door to basement on proper base 12. Repair/replace window shutters B. APPARATUS AREA 1. Repair/replace/repair all garage door lintels and repair/replace brick above lintels Pas Restore copula: repair, repaint, repair metal roofing c. THROUGHOUT if Repaint/reseal all exterior brick including chimney 2. Fill holes in brick 3. Replace/repair all building fascia 4 Improve all building site lighting 3. INTERIOR A Administration, dormitory kitchen wing aay Flooring, replace throughout 2. Walls, replace/repair/repaint throughout Repair leak in ceiling from roof by chimney Repair shower tile 3. Ceiling, repair/repaint exposed metal deck ceiling in day room Remove/replace acoustical tiles in dormitory/weight room Repair/replace/repaint all other ceilings 4. Doors, replace and upgrade all interior and exterior passage doors
File revisions (1)
- Sep 29, 2026
ebda9f3bcbaf1,756,215 bytes