Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 24, 2018

112-18 Additional Attachment 4.24.18.pdf

Preserved file SHA-256ebda9f3bcbaf27ea201d640d72319f762252c7ec4ebc36b1f51694f89372afb2

Indexed text · page 4

Show all pages
Page 4

4. NOTE: Replace door hardware Stairs, upgrade stair rail Repair/repaint rusting stairs Windows, replace, double pane, low-e glass, insulated frames Miscellaneous, repair radiator covers, Treat mold in shower rooms, walls and ceilings Replace, urinal partition MECHANICAL, ELECTRICAL, PLUMBING A. HVAC if. Replace all windows and through the wall air conditioning units with split systems for each main area 2. Insulate hot water heating piping 3. Evaluate condition of heat feed lines, replace as needed 4. Replace/upgrade all HVAC controls 5; Improve exhaust systems in bathrooms and shower areas 6. Provide grills for exhaust fans in interior spaces 7. Identify air compressor wiring and piping to be removed B. ELECTRICAL 1. Remove/replace/upgrade main panel and distribution equipment 2. Verify active wiring. Identify wiring and equipment not used to be removed 3. Provide additional receptacles and circuits for the watch room 4, Update panel schedules 5. Support and cover all exposed wiring Cc. PLUMBING 1. Upgrade all plumbing fixtures to low flow with ADA compliant flush valves and handles v8 Provide pit cover for sump pump 3. Provide a decontamination sink D. FIRE ALARMS 1 Review and upgrade fire alarm system as required 2s Identify abandoned equipment to be removed BARRIER FREE CODE, ADA COMPLIANT Upgrade doors, plumbing fixtures, front public entrance to barrier free code and ADA compliance where necessary. Provide ADA Compliant water Fountain ASBESTOS ABATEMENT AS NECESSARY TO IMPLEMENT IMPROVEMENTS CONSTRUCTION COST ESTIMATES Energy efficient lighting was recently installed on the inside and outside of the Fire Station. This lighting shall be incorporated into all building improvements.

File revisions (1)