Supporting Documentation · Apr 24, 2018
112-18 Additional Attachment 4.24.18.pdf
ebda9f3bcbaf27ea201d640d72319f762252c7ec4ebc36b1f51694f89372afb2Indexed text · page 5
Show all pagesFire Station No. 4 280 Pleasant Valley Way T. SITE A. New barrier free code compliant ADA front entrance 2. BUILDING ENTRANCE A. THROUGHOUT t. Replace entire roof 2. Replace all exhaust fans and curbs 3. Replace all roof drains, provide additional roof drains as needed 4. Reflash all edge flashing 5. Replace access ladder between roof levels 6. Replace access hatch to roof 7. Replace skylights with new ones with shades B. WALLS 1. Repair cracks 2 Repoint all brick 3. Reseal all brick 4. Replace/repaint fascia where necessary 5 Replace both water deflevtors over main doors Gs WINDOWS 4. Replace all windows with double pane low-e glass with insulated frames 2. Recaulk sill joints D. DOORS 1. Lintels, repair/repaint/replace as necessary 2. Metal bases, repair/repaint/replace as necessary 3: Steel plate headers, repair/repaint/replace as necessary 4. Replace all man/woman passage doors 5. Replace trim in end bay apparatus door 6. Replace trim over center bay door E. MISCELLANEOUS 1. Repair and clean soffits 2. Upgrade and improve soffit lighting 3. Upgrade and improve outdoor lighting 3. BUILDING INTERIOR A. FLOORS 1. Replace all floors in administration, dormitory and kitchen wing B. WALLS
File revisions (1)
- Sep 29, 2026
ebda9f3bcbaf1,756,215 bytes