Supporting Documentation · Apr 24, 2018
112-18 Additional Attachment 4.24.18.pdf
ebda9f3bcbaf27ea201d640d72319f762252c7ec4ebc36b1f51694f89372afb2Indexed text · page 8
Show all pagesFire Station No. 5 25 Mt. Pleasant Place i BUILDING EXTERIOR A. ROOF 1. Replace the entire roof system with a new roof. This includes the main roof, the two lower roofs (east and west side) the hose tower and northwest stair tower 2. Repair/replace roof drains. Add roof drains where necessary 3. Replace roof on all parapets 4. New roof shall be pitched away from HVAC units to prevent ponding and debris collection 5. Replace hose tower ladder B. WALLS 1. Design system in split face black walls in 1997 stair tower addition to prevent water migration into CMU block of northwest stair tower Cc. HVAC 1. Replace all rooftop HVAC units that have not been replaced since building was renovated 1997 2. CONSTRUCTION COST ESTIMATES NOTE: Rooftop HVAC units are scheduled to be replaced as part of energy efficiency improvements to this Fire Station which includes interior and exterior lighting improvements.
File revisions (1)
- Sep 29, 2026
ebda9f3bcbaf1,756,215 bytes