Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 8, 2018

121-18 Attachment.pdf

Preserved file SHA-25645ee768f619f7a965cb04f2e271fe5eaa4294094221644a2d503f8283e07abc0

Indexed text · page 13

Show all pages
Page 13

N Bs SS a " Baws YOUR GOALS. OUR MISSIO1 September 29, 2017 HN. Leonard R. Lepore, PE, Municipal Engineer Township of West Orange Director, Department of Public Works, Engineering Division 25 Lakeside Avenue, West Orange, NJ 07052 Re: Proposal for Professional Services - Groundwater Monitoring, USTs Closure and Excavation Fire House No. 4, 280 Pleasant Valley Way Township of West Orange, Essex County, New Jersey NJDEP Case # 93-6-29-1721-47 — PI # 014430 T&M Project No. TWOROH-17002 Dear Mr. Lepore: T&M Associates (T&M) is pleased to provide this proposal for Professional Environmental and Licensed Site Remediation Services to provide environmental consulting services for groundwater monitoring, USTs closure and excavation of impacted soil at the Fire House No. 4, located at 280 Pleasant Valley Way (Site). The proposed scope of work is prepared to satisfy the New Jersey Department of Environmental Protection (NJDEP) requirements stated in the Administrative Requirements for Remediation of Contaminated Sites (ARRCS Rule, N.J.A.C. 26:C) and the Technical Requirements for Site Remediation (Tech Rule, N.J.A.C. 7:26), in accordance with New Jersey’s Site Remediation Reform Act (SRRA). SCOPE OF SERVICES Several remediation work activities have been undertaken since the remediation was initiated at the Site. Based the review of existing remediation documents, T&M has prepared the following scope of work to comply with the NJDEP Technical Requirements for Site Remediation at the Site and provide the consultation and project management necessary to continue to advance the project towards closure. Task 1: Licensed Site Remediation Professional (LSRP) Project Management/Notice of Intent to Close Regulated Underground Storage Tanks AT&M employed LSRP will manage the two USTs closure/removal operation and associated sampling and reporting. The LSRP will prepare and submit required NJDEP forms at the completion of the two USTs closure operations, if no additional work is required. In order to facilitate the work, the LSRP will provide project management services during the process, provide technical support and consult regulatory authorities, if necessary, to the degree feasible. It is our understanding that West Orange Township (Client) desires to close/remove one (1) double-wall, 2,500-gallon capacity diesel fuel UST and one (1) Fiberglass-reinforced

Page 13

to the degree feasible. It is our understanding that West Orange Township (Client) desires to close/remove one (1) double-wall, 2,500-gallon capacity diesel fuel UST and one (1) Fiberglass-reinforced plastic, 1,000-gallon capacity unleaded gasoline UST installed 3/1/1994. T&M will prepare and submit the two required Closure of a UST System Forms (14-day Notice of Intent) to the NJDEP for approval. A copy of the closure approvals will be provided to the NJDEP-certified UST contractor to obtain local construction permits. The existing USTs are currently registered with the NJDEP. As such, it is assumed that registration of the existing USTs will not be required. Accordingly, T&M has not included any costs to prepare and submit an T&M ASSOCIATES, 11 Tindall Road, Middletown, NJ 07748 14 732.671.6400 42 732.671.7365 fi tandmassociates.com

File revisions (1)