Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 8, 2018

121-18 Attachment.pdf

Preserved file SHA-25645ee768f619f7a965cb04f2e271fe5eaa4294094221644a2d503f8283e07abc0

Indexed text · page 21

Show all pages
Page 21

ASSOCIATES Mr. Leonard R. Lepore, PE April 18, 2018 Municipal Engineer/Director of Public Works Page 2 of 10 Re: Fire House No. 4, 280 Pleasant Valley Way— LSRP Services Task 1: Licensed Site Remediation Professional (LSRP) Project Management/Notice of Intent to Close Regulated Underground Storage Tanks The LSRP of Record for the Site will manage the two USTs closure/removal operation and associated sampling and reporting. The LSRP will prepare and submit required NJDEP forms at the completion of the two USTs closure operations, if no additional work is required. In order to facilitate the work, the LSRP will provide project management services during the process, provide technical support and consult regulatory authorities, if necessary, to the degree feasible. It is our understanding that West Orange Township (Client) desires to close/remove one (1) double-wall, 2,500-gallon capacity diesel fuel UST and one (1) Fiberglass-reinforced plastic, 1,000-gallon capacity unleaded gasoline UST installed 3/1/1994. CME will prepare and submit the two required Closure of a UST System Forms (14-day Notice of Intent) to the NJDEP for approval. A copy of the closure approvals will be provided to the NJDEP-certified UST contractor to obtain local construction permits. The existing USTs are currently registered with the NJDEP. As such, it is assumed that registration of the existing USTs will not be required. Accordingly, CME has not included any costs to prepare and submit an initial USTs Facility Questionnaires to the NJDEP or any past-due USTs registration fees for the existing USTs. If these items are required, the scope of work presented herein will require revision, and a proposal will be submitted to the Client for approval prior to addressing such items. Task 2: USTs Removal/Closure Supervision and Soil Sampling It is our understanding that the Client will be independently selecting a NJDEP-certified UST contractor to perform the two USTs closure, and site restoration services. CME will provide oversight during the removal of the two USTs by the NJDEP-certified UST contractor retained by the Client directly. CME will provide a Sub-Surface Evaluator to provide on Site supervision inspection during the course of the two USTs removal/closure and backfilling operations to verify that these operations are performed in accordance with the NJDEP

Page 21

luator to provide on Site supervision inspection during the course of the two USTs removal/closure and backfilling operations to verify that these operations are performed in accordance with the NJDEP regulations, recommended industry procedure and permitting requirements. For the purpose of this proposal and budgeting purposes, CME anticipates two (2) days of field activity and

File revisions (1)