Supporting Documentation · May 8, 2018
121-18 Attachment.pdf
45ee768f619f7a965cb04f2e271fe5eaa4294094221644a2d503f8283e07abc0Indexed text · page 26
Show all pagesASSOCIATES Mr. Leonard R. Lepore, PE April 18, 2018 Municipal Engineer/Director of Public Works Page 7 of 10 Re: Fire House No. 4, 280 Pleasant Valley Way— LSRP Services to continue to advance the project towards closure. Two Separate Reports will be prepared for the identified scope of work as follows: Site Investigation Report/Remedial Action Report (SIR/RAR) for USTs Closure: The results of the two USTs closure operations will be presented in the form of a Site Investigation Report/Remedial Action Report (SIR/RAR) assuming no discharges are confirmed during the closure operations. The SIR/RAR will detail the activities conducted to achieve compliance with the NJDEP Technical Requirements for Site Remediation (NJAC 7:26E-3.3), and the Administrative Requirements for the Remediation of Contaminated Sites (“the ARRCS Rule”). The report will present a narrative containing the results of our investigation and will present tabulated laboratory test results, quality assurance data, and other pertinent items as specified in the SIR/RAR submission requirements of the NJDEP Technical Requirements for SIR (NJAC 7:26E-3.13). All sampling results will be submitted to the NJDEP with a Reduced Laboratory Data Deliverables Format, along with Electronic Data Submission (N.J.A.C. 7:26E-3.13(c) (3) (v). The SIR/RAR will also include all backfill receipts, proof of the two USTs disposal, and other pertinent information. Remedial Action Workplan (RAW): In the second Report, CME will include the identified scope of work related to the soil and groundwater remediation in a Remedial Action Workplan/Remedial Action Report (RAW/RAR) and submit it to the NIDEP. The RAW will detail the proposed remedial action methodology and compliance monitoring/sampling programs and submitted to the NJDEP with other pertinent items as specified in the RAW submission requirements of the NJDEP Technical Requirements for Site Remediation. CME will prepare a Safety and Health Plan (SHP) and Quality Assurance Project Plan (QAPP) that are required to be submitted with the RAW.
File revisions (1)
- Sep 29, 2026
45ee768f619f10,212,590 bytes