Supporting Documentation · May 22, 2018
138-18 SCE - Attachment 1 - Lafayette Park.pdf
815bfb226fa8c136dd6c6daacc6ce4a9d6a9fe2bb03ac775f7d99c3a3b635a49Indexed text · page 2
Show all pagesSCE-P10011.011 May 3, 2018 Topographic Survey Deliverable SCE will review all provided documents for utility investigation. SCE will download all collected data and place in AutoCAD for preparation of mapping. The Partial Existing Conditions & Topographic Survey will be prepared and drafted at an appropriate scale showing all collected field data, including any/all improvements within project area. Topography will be depicted at 1- foot contour intervals with appropriate spot grade elevations as necessary. SCE will utilize AutoCAD Civil 3D design software to map and model the existing conditions of the site. Deliverables = Digital (pdf) signed and sealed copies of Partial Existing Conditions & Topographic Survey. Design and Bid Documents. Permitting & Grant Administration Review of Existing Plans The SCE Design Team has included the time necessary to perform additional detailed site inspections of the facility and review of the available records prior to implementation of the preliminary design tasks. We will review existing plans and documents previously prepared for the site if available. This detailed review of documentation will be collected and evaluated to obtain a more thorough assessment of all existing features and utilities associated with the property as provided by the Township. This review and reference material will become the baseline data for our preliminary and final design documents. Meetings. Coordination and Material Selection The SCE Design Team will be available for meetings with the Township Officials and project stakeholders, and regulatory agencies to provide appropriate copies of design information and documents for exchange of information and facts associated with the improvements, For the purpose of this proposal, we have anticipated a maximum of three (3) non-public type meetings for the various project phases to include all phases of the project. Our Design Team has a known reputation to deliver projects as envisioned by our clients, fulfilling the project goals beyond their expectations. The proposed schedule approved by the Township and the Green Acres program is appropriate for a project of this nature and the Design Team is absolutely confident that through the implementation of our perfected management tools and procedures we will be able to deliver the project as anticipated. Cooperation of all parties
e Design Team is absolutely confident that through the implementation of our perfected management tools and procedures we will be able to deliver the project as anticipated. Cooperation of all parties is paramount, and the Design Team recognizes the necessity for our team members to be proactive in providing advance notice throughout all phases of the project. Drainage Design SCE will perform an overview of the required drainage repairs or requirements for existing conditions. Our site inspections revealed that existing storm drainage does exist on site. SCE will provide solutions to any existing drainage problems, if any, and provide design of the drainage
File revisions (1)
- Sep 29, 2026
815bfb226fa83,822,013 bytes