Supporting Documentation · Jun 26, 2018
158-18 Attachment.pdf
dd5782875d23c4d081f3cafec9272b46d3205a65d4246653e3547d1e8400e001Indexed text · page 2
Show all pagesKPN Proposal West Orange High School Page 2 of 4 Thursday, June 14, 2018 GroomRight & SweepRight Ls $7,575.000000 $7,575.00 Performance & Payment Bonds Ls $77.29 377.29 Total Alternate #3 $7,052.29 Ad Track Work CLEANING - Thoroughly air blow and clean the entire surface. POWER WASH - Utilizing the Cyclone CY 5500, high pressure washing equippment, thoroughly clean the entire running track and field event areas using a rotating high pressure washing head capable of producing heated water and utilizing a water reclamation and filtration system to conserve water and capture surface contaminants. Water will be filtered through filtration bags before being released to drain into surrounding grass or soil on site. This water may have a slight color tint resulting from contact with oxidized surface coatings. Solid waste will be captured and properly disposed of. The facility owner is responsible for providing a water source. MISC REPAIRS - repair any existing cracks, open seams, holes or otherwise damaged sections of the existing resilient surface using compatible urethane materials. RESURFACE WEARING COURSE - All cleaned and prepared surfaces shall receive the Beynon 6SS- 2000 Resurfacing System consisting of a 5mm th ick overlay of 2-component polyurethane and EPDM. rubber. The total area to be resurfaced is approximately 6,166 square yards. Color Red , Surlace Texure Embedded. LINE MARKING - Utilizing 100% polyurethane line marking paint, layout and machine spray all lane lines, numerals and event markings. Certification is included. Copies of an "as built" drawing depicting all markings, complete with color key, will be provided. LS $265,125.00 $265, 125.00 Performance & Payment Bonds Ls $2,705.09 $2,705.09 Total Alternate #4 $267,330.09 EXCLUSIONS: vay E & S Controls - Per Plan. Sales Tax- Owner to provide tax exempt certificate Supply or installation of Perimeter Safety Fencing Rock excavation, haul off spoils offsite Site Security
File revisions (1)
- Sep 29, 2026
dd5782875d231,715,584 bytes