Show all pagesKPN Proposal West Orange High School Page 3 of 4 Thursday, June 14, 2018 6. Unsuitable soils - Once subgrade has been established, a proof roll will be required to ensure structure stability of the soils. In the event that unsuitable soils are encountered, a price to remedy the areas will be negotiated between owner and contractor. 7. Installation of manholes, junction boxes, gabions, concrete or rock rip rap, storm drainage not related to the field construction, grate inlets, RCP 8. Relocation, removal of existing utilities not limited to electrical conduits, power poles, water, sewer, gas cable, telephone, storm drainage, irrigation heads, lines, valve boxes or wiring of same 9. Permits and fees are responsibility of owner 10. Construction signs (If necessary, are responsibility of owner) 11. Small vehicle to tow FieldTurf maintenance equipment 12. Geotechnical investigation of site NOTES: *To be eligible for infill reuse, FieldTurf will follow the steps below to assure quality and performance are met. If the infill passes all our internal testing, the option of infill reuse is plausible. 1. Collection: The first step is to collect some of the infill from the field. Our skilled collection team will remove infill from ~2 square feet using our infill extraction protocol and take infill depth at several locations. 2. Diagnosis: The collected infill materials will be sent to our Innovation and Performance Center to be analyzed. The testing protocol includes key considerations for the following categories: Cleanliness - Unwanted material Shock Attenuation /Gmax - % Fines - Infill Mix Ability to re-install Notwithstanding any other document or agreement entered into by FieldTurf in connection with the supply and installation only of its product pursuant to the present bid proposal, the following shall apply: a) Pricing is based on the attached field layout b) This bid proposal and its acceptance is subject to strikes, accidents, delays beyond our control and force majeure; c) Final payment shall be upon the substantial completion of FieldTurf’s obligations; d) FieldTurf requires a minimum of 21 days after receiving final approvals on shop drawings to manufacture, coordinate delivery and schedule arrival of installation crew. Under a typical field size and scenario, FieldTurf further requires approximately 120 days unencumbered access to the
ngs to manufacture, coordinate delivery and schedule arrival of installation crew. Under a typical field size and scenario, FieldTurf further requires approximately 120 days unencumbered access to the field to complete the field, subject to weather, other delays beyond the control of FieldTurf and force majeure. e) FieldTurf requires a suitable staging area. Staging area must be square footage of field x 0.12, have a minimum access of 15 feet wide by 15 feet high, and, no more than 100ft from the site. A 25 foot wide by 25 foot long hard or paved clean surface area located within 50 feet of the playing surface shall be provided for purposes of proper mixing of infill material. Access to any field will include suitable bridging over curbs from the staging area to permit suitable access to the field by low clearance vehicles. £) This proposal is based on a single mobilization. If the site is not ready and additional mobilizations are necessary, additional charges will apply. g) FieldTurf shall be entitled to pursue all costs and expenses, including attorney fees, associated with collection procedures of payment of any past due invoice.
File revisions (1)
- Sep 29, 2026
dd5782875d231,715,584 bytes