Supporting Documentation · Jun 26, 2018
162-18 Attachment 1 b.pdf
945babcda04ad6a0e0e69bd7fd069f62fd439d677671c83f22bcd608d128f61dIndexed text · page 4
Show all pagesOffice of the County Clerk ‘The renovation of the Union County Courthouse was a multi-phase project. The scheme included the County Clerk’s Office and Passport Office. In place of the old rooftop courtyard, we raised the roof to create space for the Passport Office. The Elections Office was placed close to the atrium stair to allow easy access during elections, A new computer room was provided with a new fire protection system installed, Also newly installed was a air conditioning system in the Clerk’s record room. A new lunch room and lockers were provided for the record room searchers. ‘The project also included new toilets, new HVAC systems, lighting and ceilings throughout, Linden School #8 The School 8 Addition, located to the rear of the otiginal building, includes new classrooms, office space, cafeteria and play area. ‘The Musial Group took great care in referencing and matching the proportions and materials of the existing school building to fit within the neighborhood fabric. Particular attention was given to the timing and phasing of the design and renovation process to ensure the least imposition on the School's daily operation Westfield YMCA The existing Westfield Area YMCA consists of an original building dating from 1927, a major gym and pool addition built in the 1960's, and various renovations in the 1990's, We have been involved with several phased renovation / additions to add a new elevator, a new building entrance with stairs and ramp, and a new exit stair and toilet rooms ar the rear of the building. The renovation has been constructed with the building fully occupied, which requires careful coordination with the Owner's schedule by both our team during design and by the Contractors during construction. + Phases 1&2 THE MUSIAL GROUP ARCHITECTURE
File revisions (1)
- Sep 29, 2026
945babcda04a7,205,324 bytes