Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 26, 2018

162-18 Attachment 2.pdf

Preserved file SHA-256200337f7a4da3c4fe3378795c262e59a712a62032bb7ba415a2884c867baf7a8

Indexed text · page 2

Show all pages
Page 2

LLC So ELECTRICAL i, Replace 600 AMP main panel and breakers MISC SAFETY i, Replace fire alarm and detection system. ii, Replace lower level floor tiles (testing required) KITCHEN i, Replace existing counter, sink, refrigerator and appliances CEILING i. Replace ceiling tiles, upper level adult areas ii. Replace ceiling tiles, lower level storage/stack area 3. ASBESTOS ABATEMENT IN WORK AREAS — BASED ON REPORT 05-29-18 a. b. Cc. Roof Materials i, NJ allows roofing contractors to remove asbestos containing roof materials using prescribed methods. ii, No monitoring is required to best of our knowledge VAT tiles i. Asbestos containing floor tiles can be removed by heating and carefully removing without breaking or pulverizing the tiles. ii. Building can remain occupied. ili. Air test at completion. iv. No on-going monitoring required to best of our knowledge. Ceilings i. NJ Sub-Chapter 8 Asbestos Abatement Procedures must be followed for removal of asbestos- containing ceiling tiles. ii, Considered friable material, ii. Must vacate the building. iv. Full monitoring required. B. ARCHITECTURAL DESIGN SERVICES 1, FIELD WORK, RESEARCH, PRELIMINARY DESIGN & CODE ANALYSIS a. b. C. Meet with the Township to discuss project requirements and goals; Further develop a design program with the Township's staff to define the relevant functional and operational relationships necessary for an efficient and economical facility; Develop conceptual designs and review them with the Township to ascertain realistic alternatives and objectives; Prepare preliminary drawings to illustrate program requirements Based upon approved preliminary documents, investigate construction and planning alternatives and prepare documents that describe the size and character of the entire project as to architectural components, Architecture & Planning New Jersey Certificate of Authorization AC 830 611 Main Street, Second Floor, Boonton, NJ 07005 Telephone 973 538 3815 Facsimile 973 538 4095 www.herbstmusciano.com

File revisions (1)