f. LLC Investigate the cost of various assemblies, components, systems, etc. 3. CONSTRUCTION DOCUMENTS PHASE a. Based on approved preliminary documents and any further adjustments in the scope and quality of the project, prepare Construction Documents for approval by the Township. These documents will consist of Drawings and specifications setting forth in detail the requirements for the construction of the project. Construction Documents will be prepared for the following disciplines and components: e — Architectural, General Construction. Plumbing Fixtures and equipment. Electrical Fire Alarm Mechanical systems 4. CONSTRUCTION CONTRACT ADMINISTRATION PHASE a. C. QUALIFICATI 1. This pro} 2. Duration Unless otherwise provided in this Agreement and incorporated in the Contract Documents, the Architect will provide administration of the Contract for Construction generally as follows: ¢ The Architect will assist the Township in the process of publicly bidding the work. «Visit the site at intervals appropriate to the stage of construction to ascertain the progress of the work and its general conformity with the Construction Documents. Conduct periodic job meetings with the Contractor and Township representative. e Review and approve or take the other appropriate action on Contractor's submissions of shop drawings, including pre-engineered components and product literature with respect to their conformity with the Contract Documents. e _ Review and take action on Contractor's applications for payment. e — Prepare finish selections for all specified products and finishes. e Conduct punch list and final inspections. IONS posal assumes that this project will be administered and bid as a single overall lump sum contract. of construction administration limited to a period not to exceed 4 months, 3. This proposal excludes: a. b. c. d e. f, 4. The Clie {includin Site plan (zoning) approval process. Building permit application Identification, handling or abatement of contamination and hazardous or otherwise controlled materials, Revisions to documents made after acceptance by the Township or jurisdictional agencies or authorities. Revisions to documents due to changes made in field or due to substitution or alteration of specified materials or methods. Structural Engineering or analysis. nt shall defend, hold harmless and indemnify the

Page 3

to documents due to changes made in field or due to substitution or alteration of specified materials or methods. Structural Engineering or analysis. nt shall defend, hold harmless and indemnify the Architect for all claims, expenses, loss or liability 1g attorney's fess) incurred during the construction and/or use of the facility when constructed in accordance with plans and specifications prepared under the terms of this agreement, except as solely by reason of the acts or omissions or negligence of the Architect. Such indemnity shall extend to include all claims, expense the requ 611 Main Si , loss or liability, which occurs due to construction material or methods not in complete conformity with irements of the plans and specifications. Architecture & Planning New Jersey Certificate of Authorization AC 830 treet, Second Floor, Boonton, NJ 07005 Telephone 973 538 3815 Facsimile 973 538 4095 www.herbstmusciano.com

File revisions (1)