Show all pagesuc This estimate should only be used for budgeting. EHI will charge for actual services provided. Asbestos Safety Technician: 10 shifts @ $816/shift... $8,160. Phase Contrast Analysis (Off Site): 150 samples @ $18/each. ..... .$ 2,700. TEM Clearance Air Sample Analysis (Off Site): 20 samples @ $150/samople. ....... seed 3,000, NJ Department of Community Affairs 6% Surcharge on Subchapter 8 Related Work (Estimated). § 700. TASK 2 Estimated Total: $14,560. As mentioned, the above TASK 2 total is an example estimate based on a 10 working day (shift) project. The above estimate should be used for budgeting only. EHI will only charge for actual services provided. Estimated Total: (TASK 1 & 2' $ 18,160. * The above estimates make no allowance for overtime. All work in excess of eight hours per shift, forty hours per week, or work on Saturdays and Sundays will be charged at an overtime rate of 1.5 times the basic rates identified. Work performed on Holidays will be charged at an overtime rate of 2 times the basic rates identified. As previously stated, the cost estimate is based on all work including clearance air sampling and demobilization being completed in no more than ten (10) eight (8) hour weekday work shifts. The air clearance sampling is based on 4 large work areas needing clearance per firehouse. Below is a listing of the rates we will employ for all work associated with this project: Asbestos Safety Technician. Asbestos Inspector. .. Asbestos Safety Technician Overtime Rate. $680/shift . $85/hour $127.50/hour On-Site Microscopist (includes PCM analysis). $850/shift Project Designer... $95/hour Phase Contrast Microscopy Analysis (off site) $15/sample Transmission Electron Microscopy Analysis (off site analysis 12 Hour T/A: $125/sample 24 Hour T/A: $ 85/sample 72 Hour T/A: $ 65/sample 5 Day T/A: $ 40/sample Overnight shipping of samples to laboratory. $35/shipment Messenger - for Immediate Delivery of samples to laboratory. $200/delivery Travel: Sparta Office to Site. .... .. $50/trip The Asbestos Hazard Abatement Subchapter 8 requires that the Asbestos Safety Control Monitor has no economic relationship with any other party other than the Municipality involved in the work. Itis assumed that abatement monitor will be contracted directly with the Township of West Orange. - END - Architecture & Planning NJ Certificate of Authorization
Municipality involved in the work. Itis assumed that abatement monitor will be contracted directly with the Township of West Orange. - END - Architecture & Planning NJ Certificate of Authorization AC 830 611 Main Street, Second Floor, Boonton, NJ 07005 Telephone 973 538 3815 Facsimile 973 538 4095 www.herbstmusciano.com 2s
File revisions (1)
- Sep 29, 2026
200337f7a4da2,407,770 bytes