Supporting Documentation · Jun 26, 2018
162-18 Attachment 3.pdf
5644d3e71d92513b61cebb2f5d4b53784d787f0e624da69c8d4289ab5970f61dIndexed text · page 3
Show all pagesL. Lepore, PE West Orange Public Works — Public Library Improvements. June 14, 2018 Page 3 LIMITED CONSTRUCTION PHASE SERVICES A. General During the Construction Phase. PS&S proposes to provide the following general Construction Phase Services in conjunction with this project: lL. ill. Construction Cost Estimate: shall be prepared on the before the final issued for bid documents. Bid Analysis: tabular bid evaluation spreadsheet. Construction Administration Services: a. Review and approve or take other appropriate action upon the Contractor's submittals such as shop drawings, product data and samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Construction Documents. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for installation or performance of equipment or systems designed by the Contractor, all of which remain the responsibility of the Contractor to the extent required by the Construction Documents. Responses to Requests for Information (RFIs) and Requests for Clarification (RFCs) submitted by the Contractor(s). Perform field observations at the 50% and 100% completion phases of the ongoing construction progress to determine conformance of the completed work with the requirements of the Contract Documents. CLIENT PROVIDED ITEMS The proposed PS&S Scope of Work and associated Fee described in this proposal are based upon provision of the following by the Client: A. Copies of all existing design and as-built architectural, structural, fire protection, plumbing, HVAC and electrical drawings for the building, including electronic drawing files. if available. Services of any required testing contractors in order to determine the operating parameters or conditions of existing systems, such as flow testing of existing water service, HVAC air balance testing and available capacity on electrical services. C. Design parameters, including space temperature, and electrical requirements. D. Payment of all application and permit fees. PS Proposals\West Orange DPW 04769(090180574 West Orange Public Library\ Final Proposal\090180574_West Orange Publie Library Improvments 20180614 Does
File revisions (1)
- Sep 29, 2026
5644d3e71d923,890,403 bytes