L. Lepore, PE West Orange Public Works — Public Library Improvements. June 14, 2018 Ps: Siaa distribution devices associated with the replaced rooftop HVAC unit are in adequate condition for re-use. L. It is assumed that the existing structural platform is capable of supporting the weight of the new rooftop HVAC unit. PS&S will evaluate the platform, however has not included redesign of supplemental platform modifications. M. It is assumed that complete building automation system is not required for a single point of monitoring and control for the building, and that all controls are operated at the equipment digital controllers. N. It is assumed that all electrical wiring upstream and downstream of the replaced electrical panel will remain for reconnection to the replacement panel and breaker replacement sizes will match existing. Vv. MISCELLANEOUS PROVISIONS A. PS&S shall not be responsible for contractors’ means, methods, techniques, procedures or sequence of construction, for the safety precautions and programs incident to the work of the contractor(s), or for any failure of contractor(s) to comply with laws, rules, or regulations. To the fullest extent as permitted by law, including, but not limited to the protections afforded professional engineers pursuant to N.J.S.A. 2A:29B-1, et seq., neither PS&S nor any of its employees or representatives performing services at the site or elsewhere, shall be liable for any injury occurring on the construction project or site due to a breach or disregard of construction safety standards or practices on the construction project or site by construction contractors or others not under the employment of PS&S. PS&S expressly does not assume responsibility for the implementation, discharge or monitoring of safety standards or practices with respect to the construction project or site for anyone other than PS&S’s employees. B. PS&S shall not be responsible to search for, test for, investigate the presence of, monitor, clean up, remove, contain, treat, detoxify or neutralize asbestos, polychlorinated biphenyls, petroleum, hazardous or toxic materials, mold, radioactive material or any other pollutant within or adjacent to the building or the site, VI. FEES, TERMS AND CONDITIONS PS&S proposes to provide the aforementioned Scope of Services for a lump sum fee of Ninety Seven Thousand Nine Hundred Dollars

Page 5

or adjacent to the building or the site, VI. FEES, TERMS AND CONDITIONS PS&S proposes to provide the aforementioned Scope of Services for a lump sum fee of Ninety Seven Thousand Nine Hundred Dollars ($97,900.00), exclusive of reimbursable expenses. These services would be performed in accordance with the terms and conditions of the attached PS&S Schedule of Charges and General Conditions, dated February 1, 2018 (the Schedule). Reimbursable expenses will be billed in addition to the fee stated above and are estimated to be $7,500.00. PA ProposalsiWest Orange DPW 047691090180574 West Oranye Public Librarv\_ Final Propasal\090180574_West Orange Public Library Improvments 2018061 4.Dock

File revisions (1)