Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 5, 2019

55-19 Exhibit - Phillips Preiss to Assist Planning Board with Re-Examination Master Plan.pdf

Preserved file SHA-256870637d1d5c6098aea5f06f1666c375f786c0f33e6cfd629430bef4e6d1fe842

Indexed text · page 8

Show all pages
Page 8

Historic Preservation Plan Element Limited updates are expected for this plan element. We will address any changes in laws or regulations, as well as policy decisions by the Township that affect this plan element. Community Facilities, Utilities and Recycling Plan Element This plan element will address existing and potential future needs for community facilities. It will include a discussion of existing capacity of Township offices, Public Works facilities, emergency service facilities, the public library, schools, water and sewer, stormwater management and utilities. In particular, this element can help prioritize the need for capital improvements to existing and proposed public infrastructure. Circulation Plan Element The updates to this plan element will address improvements to roads and other transportation infrastructure and account for new development that impacts these facilities. Continued emphasis will be placed on pedestrian circulation as well as bicycle facilities planning, and advance “complete streets” efforts in conjunction with the Township’s Pedestrian Safety Advisory Board. Housing Plan Element The Township’s full Housing Element and Fair Share Plan has been prepared by others. This section would reference that document and the current status of affordable housing compliance efforts in the municipality. Open Space and Recreation Plan Element Updates can be made to the existing plan element to reflect any changes to the Township’s inventory of recreation facilities and open space. Sustainability Element This plan element which was introduced in the 2010 Master Plan Update was intended as an overarching document that addresses many of the topics included in other parts of the Master Plan in a comprehensive manner. It will be updated as necessary to further address best practices for green and sustainable design. Towards the end of this phase, a second opportunity for public involvement will be provided by holding an open house meeting. Members of the community will be given an opportunity to comment on the draft plan concepts at this meeting, with the comments taken into consideration in the preparation of the final document. In this phase, public input will be less about generating additional new ideas and more focused on ensuring that the consultants “got it right.” The comments at this meeting, along with comments from the

Page 8

this phase, public input will be less about generating additional new ideas and more focused on ensuring that the consultants “got it right.” The comments at this meeting, along with comments from the Master Plan Subcommittee, will be the basis for changes to the draft plan. We will assist with other means of outreach such as using the Township’s website and encouraging residents, merchants and other interested parties to send feedback to the Subcommittee by e-mail and regular mail and/or by dropping off comments at the municipal building and other locations. Meetings: community open house meeting, three Master Plan Subcommittee meetings Deliverables: community meeting summary, revised draft Reexamination report, draft plan element updates, draft updated maps -3-

File revisions (1)