22-20 Exhibit-Authorizing Matrix to Utilize Supplemental HDSRF Grant Funding to Complete the Remedial Investigation at the Selecto Flash.pdf

Preserved file SHA-256a9ab40b73d7e364cc4b33af6f8ace3878cbd1d8c67eda590d0ddc264a9225783

Indexed text · page 5

Show all pages
Page 5

i Matrix New World Engineering, Land Surveying and Landscape Architecture, P.C. 26 Columbia Turnpike ! Florham Park, NJ 07932 973.240.1800 Fax 973.240.1818 www.matrixneworld.com wse/dbe/sbe MATRIXM ORLD Engineering Progress Via Email and US Mail \ r January 6,2020 Township of West Orange 66 Main Street West Orange, New Jersey 07052 Attn: John K. Sayers, Business Administrator Re: HAZARDOUS DISCHARGE SITE REMEDIATION FUND (HDSRF) PROPOSAL FOR SUPPLEMENTAL ACTIVITIES TO COMPLETE REMEDIAL INVESTIGATION SELECTO FLASH INC. (FORMER) REMEDIAL INVESTIGATION 18 CENTRAL AVENUE : BLOCK 9, LOT 36 O =£ § S WEST ORANGE, ESSEX COUNTY, NEW JERSEY 07052 e... <4- NJDEP PI NO. 027054 S §v MATRIX NO. 17-296 sas \ a -n co 3(6 Dear Mr.

Page 5

co 3(6 Dear Mr. Sayers: ns rn </> at —H Matrix New World Engineering, Land Surveying and Landscape Architecture, P.C. (Matrix) is pleaif$l toS submit this proposal for environmental services to complete the Remedial Investigation (RI) and pr J* e 2: the Remedial Action Workplan (RAWP) at the Selecto Flash property located at 18 Central Avenue, ^?est rA Orange, New Jersey (Block 9, Lot 36). Specifically, this proposal outlines the activities included in the Application for a Supplemental Hazardous Discharge Site Remediation Fund (HDSRF), submitted to the ' New Jersey Department of Environmental Protection (NJDEP) on October 31, 2019, and referred to the New Jersey Economic Development Authority (NJEDA) on December 10,2019. BACKGROUND In June 2018 an application for a HDSRF Grant to complete the RI for the Selecto Flash Site was submitted ! ! to NJDEP. The total of this HDSRF RI Grant was $129,176.80. While implementing the RI Scope of ! Work (SOW) in 2019, a number of monitoring wells were found to be damaged, requiring replacement. At the suggestion of NJDEP OBR, Matrix submitted a request on September 30,2019, for the reallocation of a portion of the original RI HDSRF funding to allow for the immediate rehabilitation of the monitoring wells. The cost for the rehabilitation of the monitoring wells is estimated at $20,854. i The tasks that were

Page 5

immediate rehabilitation of the monitoring wells. The cost for the rehabilitation of the monitoring wells is estimated at $20,854. i The tasks that were removed from the original RI SOW to allow for the well rehabilitation include the completion of the RIR and Remedial Action Workplan (RAWP) and were the subject of the October 31, 2019 Application for a Supplemental HDSRF Grant. This application also included costs for one additional j well repair, two well abandonments, one additional day of soil sampling, vapor intrusion sampling, and one additional round of groundwater sampling. The total requested in the application was $44,718.00. SCOPE OF WORK AND COST ESTIMATE The scope of work included with the October 2019 HDSRF Application is included as Attachment A. The Cost Estimate included with the HDSRF Application is included as Attachment B. ' F:\2017\17-296 Selecto Flash PA_SIVProposal\2020\SeIectoFlash Proposal for Supplemental HDSRF RI Work 01062020.docx l